Preface |
|
iii | |
|
1 Concepts of Life-Cycle Analysis Under Uncertainty |
|
|
1 | (20) |
|
|
2 | (1) |
|
|
2 | (1) |
|
1.2 Life-Cycle Performance and Cost Analysis Under Uncertainty |
|
|
3 | (5) |
|
1.2.1 Structural Performance Deterioration |
|
|
3 | (3) |
|
1.2.2 Structural Performance and Cost with Maintenance |
|
|
6 | (2) |
|
1.3 Structural Performance Indicators |
|
|
8 | (6) |
|
1.4 Life-Cycle Optimization |
|
|
14 | (4) |
|
|
18 | (3) |
|
2 Inspection and Monitoring in Life-Cycle Analysis |
|
|
21 | (30) |
|
|
22 | (1) |
|
|
22 | (1) |
|
2.2 Inspection, Monitoring and Maintenance for Fatigue |
|
|
23 | (3) |
|
2.3 Inspection and Monitoring in Life-Cycle Analysis |
|
|
26 | (5) |
|
2.3.1 Effect of Inspection and Monitoring on Life-Cycle Performance |
|
|
26 | (2) |
|
2.3.2 Effect of Inspection and Monitoring on Life-Cycle Cost |
|
|
28 | (3) |
|
2.4 Performance Prediction using Inspection and Monitoring Data Life-Cycle of Structures Under Uncertainty |
|
|
31 | (11) |
|
2.4.1 Structural Performance Prediction Based on Inspection and Monitoring Data |
|
|
31 | (1) |
|
2.4.2 Availability of Inspection and Monitoring Data |
|
|
32 | (5) |
|
2.4.3 Structural Performance Prediction Error and Loss |
|
|
37 | (1) |
|
2.4.4 Updating Based on Inspection and Monitoring Data |
|
|
38 | (4) |
|
2.5 Importance Factors for Efficient Inspection and Monitoring |
|
|
42 | (7) |
|
|
49 | (2) |
|
3 Probabilistic Damage Detection |
|
|
51 | (22) |
|
|
52 | (1) |
|
|
52 | (1) |
|
3.2 Time-Dependent Fatigue Damage Propagation |
|
|
53 | (4) |
|
3.3 Probability of Fatigue Damage Detection |
|
|
57 | (3) |
|
3.4 Damage Detection Time Under Uncertainty |
|
|
60 | (11) |
|
3.4.1 Damage Detection Time and Delay for Inspection |
|
|
60 | (4) |
|
3.4.2 Damage Detection Time and Delay for Monitoring |
|
|
64 | (1) |
|
3.4.3 Damage Detection Time and Delay for Combined Inspection and Monitoring |
|
|
64 | (2) |
|
3.4.4 Damage Detection Time-Based Probability of Failure |
|
|
66 | (5) |
|
|
71 | (2) |
|
4 Damage Detection Based Optimum Inspection and Monitoring Planning |
|
|
73 | (22) |
|
|
74 | (1) |
|
|
74 | (1) |
|
4.2 Optimum Inspection Planning |
|
|
75 | (8) |
|
4.2.1 Maximizing Lifetime Probability of Damage Detection |
|
|
77 | (1) |
|
4.2.2 Minimizing Expected Fatigue Crack Damage Detection Delay |
|
|
78 | (4) |
|
4.2.3 Minimizing Damage Detection Time-Based Probability of Failure |
|
|
82 | (1) |
|
4.3 Optimum Monitoring Planning |
|
|
83 | (5) |
|
4.3.1 Minimizing Expected Fatigue Crack Damage Detection Delay |
|
|
85 | (2) |
|
4.3.2 Minimizing Damage Detection Time-Based Probability of Failure |
|
|
87 | (1) |
|
4.4 Optimum Inspection and Monitoring Planning |
|
|
88 | (5) |
|
|
93 | (2) |
|
5 Optimum Service Life and Life-Cycle Cost Management |
|
|
95 | (20) |
|
|
96 | (1) |
|
|
96 | (2) |
|
5.2 Service Life and Life-Cycle Cost Under Uncertainty |
|
|
98 | (10) |
|
5.2.1 Effect of Inspection and Maintenance on Service Life and Life-Cycle Cost |
|
|
98 | (1) |
|
5.2.2 Maintenance Delay, Service Life and Life-Cycle Cost for Inspection |
|
|
99 | (4) |
|
5.2.3 Maintenance Delay, Service Life and Life-Cycle Cost for Monitoring |
|
|
103 | (1) |
|
5.2.4 Application to a Fatigue-Sensitive Bridge |
|
|
104 | (4) |
|
5.3 Probabilistic Optimum Inspection and Monitoring Planning |
|
|
108 | (6) |
|
5.3.1 Single-Objective Probabilistic Optimization for Inspection Planning |
|
|
110 | (2) |
|
5.3.2 Single-Objective Probabilistic Optimization for Monitoring Planning |
|
|
112 | (2) |
|
|
114 | (1) |
|
6 Multi-Objective Probabilistic Life-Cycle Optimization |
|
|
115 | (28) |
|
|
116 | (1) |
|
|
116 | (1) |
|
6.2 Multi-Objective Probabilistic Optimum Inspection Planning |
|
|
117 | (14) |
|
6.2.1 Bi-Objective Optimum Inspection Planning |
|
|
118 | (4) |
|
6.2.2 Tri-Objective Optimum Inspection Planning |
|
|
122 | (5) |
|
6.2.3 Quad-Objective Optimum Inspection Planning |
|
|
127 | (1) |
|
6.2.4 Six-Objective Optimum Inspection Planning |
|
|
128 | (3) |
|
6.3 Multi-Objective Probabilistic Optimum Monitoring Planning |
|
|
131 | (10) |
|
6.3.1 Bi-Objective Optimum Monitoring Planning |
|
|
132 | (3) |
|
6.3.2 Tri-Objective Optimum Monitoring Planning |
|
|
135 | (1) |
|
6.3.3 Quad-Objective Optimum Monitoring Planning |
|
|
135 | (6) |
|
|
141 | (2) |
|
7 Decision Making for Multi-Objective Life-Cycle Optimization |
|
|
143 | (32) |
|
|
144 | (1) |
|
|
144 | (2) |
|
7.2 Decision Making Before Multi-Objective Life-Cycle Optimization |
|
|
146 | (15) |
|
7.2.1 Objective Weighting |
|
|
147 | (2) |
|
7.2.2 Application to Optimum Inspection Planning |
|
|
149 | (6) |
|
7.2.3 Application to Optimum Monitoring Planning |
|
|
155 | (6) |
|
7.3 Decision Making after Multi-Objective Life-Cycle Optimization |
|
|
161 | (13) |
|
7.3.1 Essential and Redundant Objectives |
|
|
161 | (2) |
|
7.3.2 Weights of Essential Objectives |
|
|
163 | (1) |
|
7.3.3 Multiple Attribute Decision Making |
|
|
164 | (2) |
|
7.3.4 Application to Optimum Inspection Planning |
|
|
166 | (3) |
|
7.3.5 Application to Optimum Monitoring Planning |
|
|
169 | (5) |
|
|
174 | (1) |
|
|
175 | (6) |
|
|
175 | (1) |
|
|
176 | (1) |
|
|
176 | (3) |
|
|
179 | (2) |
References |
|
181 | (14) |
Index |
|
195 | (4) |
Color Figure Section |
|
199 | |