| Preface |
|
xi | |
| Acknowledgements |
|
xiii | |
|
|
|
xv | |
|
|
|
xvii | |
|
1 Steam: A Heat Transfer Fluid |
|
|
1 | (8) |
|
|
|
1 | (2) |
|
Steam Is Safe and Flexible |
|
|
2 | (1) |
|
|
|
2 | (1) |
|
|
|
3 | (3) |
|
|
|
6 | (3) |
|
2 Steam Formation, Accumulation, and Condensation |
|
|
9 | (14) |
|
The Formation of Steam; Boiling |
|
|
9 | (4) |
|
|
|
11 | (1) |
|
|
|
11 | (2) |
|
|
|
13 | (3) |
|
|
|
14 | (2) |
|
Latent and Sensible Heat versus Pressure |
|
|
16 | (1) |
|
The Formation of Flash Steam |
|
|
16 | (2) |
|
Steam Accumulation and Storage |
|
|
18 | (2) |
|
|
|
20 | (3) |
|
3 Understanding Heat Transfer |
|
|
23 | (16) |
|
Radiation Type Heat Transfer |
|
|
23 | (3) |
|
Conduction Type Heat Transfer |
|
|
26 | (3) |
|
Convection-Type Heat Transfer |
|
|
29 | (8) |
|
The Heat Transfer Equations |
|
|
31 | (1) |
|
The Overall Heat Transfer Coefficient (U) |
|
|
31 | (2) |
|
Mean Temperature Difference (ΔTm) |
|
|
33 | (1) |
|
|
|
34 | (1) |
|
ΔTm for a Steam to Process Fluid Heat Exchanger |
|
|
35 | (1) |
|
|
|
35 | (2) |
|
|
|
37 | (2) |
|
4 Steam Quality: It Matters |
|
|
39 | (10) |
|
Why Steam Quality is Important |
|
|
40 | (1) |
|
Poor Steam Quality Cause and Cures |
|
|
40 | (3) |
|
|
|
43 | (2) |
|
|
|
45 | (1) |
|
|
|
46 | (3) |
|
5 Boiler Room Considerations |
|
|
49 | (18) |
|
Steam Generator Selection |
|
|
49 | (4) |
|
|
|
49 | (4) |
|
Steam System Performance Considerations |
|
|
53 | (2) |
|
Environmental Considerations |
|
|
55 | (5) |
|
|
|
60 | (7) |
|
|
|
67 | (16) |
|
The Ideal Steam Generator |
|
|
68 | (2) |
|
|
|
70 | (1) |
|
Fossil Fuel-Fired Boilers |
|
|
70 | (6) |
|
|
|
76 | (2) |
|
|
|
78 | (3) |
|
|
|
81 | (2) |
|
7 Boiler Trim, Fuel Delivery, and Combustion Control System |
|
|
83 | (20) |
|
The Packaged Boiler Concept |
|
|
83 | (8) |
|
Fuel Delivery and Combustion Systems |
|
|
91 | (7) |
|
|
|
98 | (5) |
|
8 The Steam Delivery System |
|
|
103 | (28) |
|
|
|
103 | (1) |
|
Steam Distribution Piping |
|
|
104 | (11) |
|
|
|
115 | (6) |
|
|
|
121 | (3) |
|
|
|
124 | (2) |
|
|
|
126 | (1) |
|
|
|
127 | (4) |
|
9 The Condensate Recovery System |
|
|
131 | (24) |
|
|
|
133 | (3) |
|
|
|
136 | (8) |
|
|
|
136 | (1) |
|
|
|
136 | (1) |
|
|
|
136 | (1) |
|
Thermostatic Steam Trap Group |
|
|
136 | (2) |
|
|
|
138 | (3) |
|
|
|
141 | (3) |
|
|
|
144 | (3) |
|
How to Size Flash Tanks and Vent Lines |
|
|
145 | (2) |
|
|
|
147 | (6) |
|
Electric Condensate Return System |
|
|
148 | (2) |
|
Pressure Motive Condensate Pump |
|
|
150 | (1) |
|
Pressure Motive Pump Installation Requirements |
|
|
150 | (3) |
|
Pumped Condensate Return Line Installation |
|
|
153 | (1) |
|
|
|
153 | (2) |
|
|
|
155 | (16) |
|
|
|
155 | (3) |
|
The Elimination of Dissolved Gases |
|
|
156 | (2) |
|
|
|
158 | (4) |
|
|
|
160 | (2) |
|
|
|
162 | (5) |
|
|
|
166 | (1) |
|
|
|
167 | (4) |
|
11 Steam System Chemistry Control |
|
|
171 | (16) |
|
|
|
171 | (1) |
|
|
|
172 | (4) |
|
|
|
176 | (1) |
|
|
|
177 | (3) |
|
|
|
180 | (3) |
|
Best Operating Practices for Boiler BD |
|
|
181 | (1) |
|
Automatic versus Manual BD Controls |
|
|
181 | (1) |
|
|
|
181 | (2) |
|
|
|
183 | (3) |
|
|
|
186 | (1) |
|
12 Steam System Applications |
|
|
187 | (18) |
|
High-Pressure Steam with High Condensate Returns |
|
|
189 | (1) |
|
Low-Pressure Steam with High Condensate Returns |
|
|
190 | (2) |
|
High- or Low-Pressure Steam with Little or No Returns |
|
|
192 | (3) |
|
High-Pressure or Superheated Steam with Condensate Returns |
|
|
195 | (1) |
|
Multiple Boiler Installations |
|
|
195 | (2) |
|
Specialized Steam Equipment |
|
|
197 | (8) |
|
Back Pressure Turbine or BPT |
|
|
197 | (1) |
|
|
|
198 | (2) |
|
|
|
200 | (2) |
|
|
|
202 | (3) |
|
13 Steam System Efficiency |
|
|
205 | (18) |
|
|
|
205 | (2) |
|
|
|
207 | (1) |
|
|
|
207 | (6) |
|
|
|
213 | (10) |
|
Boiler Internal Cleanliness |
|
|
216 | (1) |
|
Steam Delivery System Efficiency |
|
|
217 | (1) |
|
Condensate and Feed Water System Efficiency |
|
|
217 | (2) |
|
Biomass Fuel Water Content Reduction |
|
|
219 | (4) |
|
14 Shutdown, Startup, Inspection, and Maintenance |
|
|
223 | (12) |
|
Shutdown and Startup Practices |
|
|
223 | (2) |
|
|
|
225 | (2) |
|
Maintenance and Inspection Practices |
|
|
227 | (4) |
|
|
|
228 | (3) |
|
Boil Out and Layup Practices |
|
|
231 | (4) |
|
15 Troubleshooting and Commissioning Basics |
|
|
235 | (4) |
|
Startup versus Commissioning |
|
|
235 | (1) |
|
Approach to Troubleshooting |
|
|
236 | (1) |
|
Don't Play the Blame Game |
|
|
236 | (1) |
|
|
|
237 | (2) |
|
16 Commissioning and Troubleshooting the Steam Generator |
|
|
239 | (14) |
|
Determining Boiler Input, Output, and Efficiency |
|
|
239 | (2) |
|
|
|
241 | (2) |
|
Commissioning the Boiler/Burner Controls |
|
|
243 | (1) |
|
Commissioning the Boiler Pressure Control System |
|
|
243 | (1) |
|
Commissioning the Boiler Level Control System |
|
|
244 | (1) |
|
Commissioning the Boiler Blowdown Controls |
|
|
244 | (1) |
|
Steam Boiler Troubleshooting |
|
|
244 | (9) |
|
17 Commissioning and Troubleshooting the Steam Delivery System |
|
|
253 | (4) |
|
Steam Distribution Piping |
|
|
253 | (1) |
|
|
|
254 | (1) |
|
|
|
255 | (1) |
|
Condensate Trapping/Draining |
|
|
255 | (1) |
|
Troubleshooting the Steam Delivery System |
|
|
255 | (2) |
|
18 Commissioning and Troubleshooting the Condensate and Feed Water System |
|
|
257 | (6) |
|
|
|
257 | (1) |
|
|
|
258 | (1) |
|
Troubleshooting the Condensate and Feed Water Systems |
|
|
259 | (4) |
|
19 Commissioning and Troubleshooting the Water Treatment Equipment |
|
|
263 | (4) |
|
Setting Up the Water Treatment Systems |
|
|
263 | (1) |
|
Troubleshooting Water Treatment System Problems |
|
|
264 | (3) |
| Appendix A References and Reference Information |
|
267 | (16) |
| Appendix B Operations, Maintenance, and Inspection Guidance |
|
283 | (10) |
| Appendix C Steam System Design and Commissioning Guidance |
|
293 | (8) |
| Index |
|
301 | |