|
|
2 | (18) |
|
Getting Oriented to Home Improvement |
|
|
4 | (6) |
|
Your Skills and Your Project |
|
|
6 | (1) |
|
Spending Time, Spending Money |
|
|
6 | (1) |
|
|
7 | (1) |
|
|
7 | (1) |
|
|
8 | (1) |
|
Building Codes and Your Project |
|
|
8 | (1) |
|
|
8 | (2) |
|
|
10 | (6) |
|
|
12 | (1) |
|
|
12 | (1) |
|
|
13 | (1) |
|
|
13 | (1) |
|
|
13 | (1) |
|
|
13 | (1) |
|
|
13 | (1) |
|
|
14 | (1) |
|
|
14 | (1) |
|
|
14 | (2) |
|
|
14 | (1) |
|
|
15 | (1) |
|
|
15 | (1) |
|
|
15 | (1) |
|
|
16 | (4) |
|
|
17 | (1) |
|
|
17 | (1) |
|
|
18 | (1) |
|
|
18 | (1) |
|
|
19 | (1) |
|
|
20 | (42) |
|
|
22 | (8) |
|
|
23 | (2) |
|
|
24 | (1) |
|
Electrical Considerations |
|
|
24 | (1) |
|
|
25 | (1) |
|
Step 3: Hanging Rock (Fastening Drywall) |
|
|
25 | (2) |
|
Step 4: The Taping Ceremony |
|
|
27 | (1) |
|
Step 5: Finishing the Job |
|
|
28 | (2) |
|
|
30 | (10) |
|
Step 1: Making the Pattern |
|
|
32 | (1) |
|
|
32 | (1) |
|
|
32 | (1) |
|
|
32 | (1) |
|
|
33 | (1) |
|
Step 4: Positioning and Attaching the Forms |
|
|
34 | (1) |
|
Step 5: Cutting and Attaching the Drywall |
|
|
35 | (1) |
|
Step 6: Drywalling over an Existing Arch |
|
|
36 | (2) |
|
|
36 | (1) |
|
Cutting with a Rotary Tool |
|
|
36 | (2) |
|
|
38 | (2) |
|
Build a Stud Wall and Fasten Drywall |
|
|
40 | (14) |
|
Step 1: Planning and Layout |
|
|
41 | (3) |
|
|
42 | (1) |
|
|
43 | (1) |
|
|
43 | (1) |
|
|
43 | (1) |
|
Step 2: Fastening the Sole Plates |
|
|
44 | (1) |
|
|
44 | (1) |
|
|
45 | (1) |
|
Step 3: Attaching the Top Plate |
|
|
45 | (2) |
|
|
46 | (1) |
|
|
47 | (3) |
|
|
47 | (1) |
|
|
48 | (2) |
|
Step 5: Drywalling Season |
|
|
50 | (4) |
|
|
54 | (8) |
|
Step 1: Layout and Prep Made Easy |
|
|
55 | (2) |
|
|
55 | (1) |
|
|
56 | (1) |
|
Step 2: Getting Support: Meet the Nailers |
|
|
57 | (1) |
|
|
57 | (1) |
|
Step 4: Finishing the Job |
|
|
58 | (4) |
|
|
58 | (1) |
|
|
59 | (3) |
|
Part 3: Windows and Doors |
|
|
62 | (26) |
|
Hang a Door in the Existing Jambs |
|
|
64 | (6) |
|
|
65 | (2) |
|
|
67 | (1) |
|
Step 3: Position and Attach the Door |
|
|
68 | (1) |
|
Step 4: Install the Doorknob |
|
|
68 | (2) |
|
|
70 | (6) |
|
Step 1: Prepare the Opening |
|
|
71 | (1) |
|
Step 2: Buy the Right Door |
|
|
72 | (1) |
|
|
72 | (1) |
|
|
72 | (1) |
|
|
72 | (1) |
|
Step 3: Position and Fasten the Jambs |
|
|
73 | (2) |
|
|
75 | (1) |
|
Install a New Combination Storm-Screen Door |
|
|
76 | (6) |
|
Step 1: Choosing a Storm Door |
|
|
77 | (2) |
|
Step 2: Attachment Theory |
|
|
79 | (1) |
|
Step 3: A Little Hardware and You're Done! |
|
|
80 | (2) |
|
Install a Tilt-In Window in the Old Jambs |
|
|
82 | (6) |
|
Step 1: Planning the Installation |
|
|
83 | (1) |
|
Step 2: Delicious Demolition |
|
|
84 | (1) |
|
|
85 | (1) |
|
|
85 | (1) |
|
Step 3: Puttin' It All Together |
|
|
85 | (3) |
|
|
86 | (1) |
|
|
87 | (1) |
|
Part 4: Floors: Getting Underfoot |
|
|
88 | (28) |
|
Install Wood Strip or Laminate Flooring |
|
|
90 | (10) |
|
Step 1: Preparing to Get Floored |
|
|
92 | (1) |
|
|
92 | (1) |
|
Floor Installation Basics |
|
|
92 | (1) |
|
|
92 | (2) |
|
|
93 | (1) |
|
|
93 | (1) |
|
Step 3: Working Across the Floor |
|
|
94 | (1) |
|
Step 4: So Your Room Isn't So Simple? |
|
|
95 | (1) |
|
Step 5: Floor Sanding Made Simple |
|
|
96 | (1) |
|
|
97 | (1) |
|
Step 7: Laminate Flooring Installation |
|
|
98 | (2) |
|
|
98 | (1) |
|
|
99 | (1) |
|
|
99 | (1) |
|
|
100 | (10) |
|
Step 1: Preparing to Tile |
|
|
101 | (2) |
|
|
102 | (1) |
|
|
102 | (1) |
|
Mortaring the Underlayment |
|
|
103 | (1) |
|
Step 2: Where to Start Tiling? |
|
|
103 | (2) |
|
|
103 | (2) |
|
|
105 | (1) |
|
|
105 | (2) |
|
|
107 | (3) |
|
|
110 | (6) |
|
Step 1: Prepare for Your Floor |
|
|
111 | (1) |
|
Step 2: Making the Template |
|
|
112 | (1) |
|
Step 3: Cut and Fasten the Underlayment |
|
|
113 | (1) |
|
|
113 | (3) |
|
|
113 | (1) |
|
|
114 | (2) |
|
Part 5: Storage Solutions |
|
|
116 | (24) |
|
Build and Install Built-In Bookshelves |
|
|
118 | (6) |
|
|
119 | (1) |
|
|
120 | (1) |
|
Step 3: Preparing the Pieces |
|
|
120 | (2) |
|
|
122 | (1) |
|
|
122 | (2) |
|
Build a Front for an Existing Wall Cabinet |
|
|
124 | (12) |
|
Step 1: Make the Face and Frame |
|
|
125 | (3) |
|
|
126 | (1) |
|
|
127 | (1) |
|
|
127 | (1) |
|
|
128 | (2) |
|
|
129 | (1) |
|
|
130 | (2) |
|
|
130 | (1) |
|
|
131 | (1) |
|
Step 4: Dress Up the Doors |
|
|
132 | (2) |
|
|
132 | (1) |
|
|
133 | (1) |
|
|
134 | (2) |
|
Install Pegboard on a Concrete Wall |
|
|
136 | (4) |
|
Step 1: Lay Out the Nailers |
|
|
137 | (1) |
|
Step 2: Attach to the Wall |
|
|
138 | (1) |
|
Step 3: Cut and Attach the Boards |
|
|
139 | (1) |
|
|
140 | (38) |
|
Replace a Kitchen Sink and/or Fixture |
|
|
142 | (8) |
|
|
144 | (1) |
|
If You're Replacing Just the Fixtures |
|
|
144 | (1) |
|
Step 1: Locate the Cutout |
|
|
145 | (1) |
|
Step 2: Mount the Fixtures First |
|
|
145 | (2) |
|
Attach the Faucets and Spigots |
|
|
145 | (1) |
|
Attach the Dishwasher Air Gap |
|
|
146 | (1) |
|
Step 3: Connect the Tailpiece and Drain |
|
|
147 | (1) |
|
|
147 | (1) |
|
|
147 | (1) |
|
|
147 | (1) |
|
Step 5: Connect the Drain and Dishwasher |
|
|
148 | (1) |
|
|
148 | (1) |
|
|
148 | (1) |
|
Step 6: Connect the Water Supplies |
|
|
149 | (1) |
|
Tile a Kitchen Countertop and Backsplash |
|
|
150 | (12) |
|
|
151 | (2) |
|
|
152 | (1) |
|
|
152 | (1) |
|
|
153 | (1) |
|
Step 3: Make a Solid Substrate |
|
|
154 | (2) |
|
|
154 | (1) |
|
|
155 | (1) |
|
Step 4: Laying Out the Tile |
|
|
156 | (1) |
|
|
157 | (1) |
|
|
158 | (2) |
|
|
158 | (1) |
|
|
159 | (1) |
|
|
160 | (1) |
|
|
160 | (1) |
|
|
161 | (1) |
|
Build and Install Drawers in Your Kitchen Cabinet |
|
|
162 | (6) |
|
Step 1: Make Some Decisions |
|
|
163 | (1) |
|
Use the Existing Kitchen Face: Less Work, but Less Freedom |
|
|
164 | (1) |
|
Putting on a New Face: More Work, but More Freedom |
|
|
164 | (1) |
|
Step 2: Make the ``Sleds'' |
|
|
164 | (1) |
|
|
165 | (1) |
|
Step 4: Attach the Drawer Slides |
|
|
166 | (2) |
|
Screw the Slides to the Sleds |
|
|
166 | (1) |
|
Screw the Sled to the Cabinet |
|
|
167 | (1) |
|
|
167 | (1) |
|
Build and Attach New Fronts for Kitchen Cabinets |
|
|
168 | (10) |
|
|
170 | (1) |
|
|
170 | (1) |
|
Step 3: Build the Face Frame |
|
|
171 | (1) |
|
Step 4: Attach the Face Frame |
|
|
172 | (1) |
|
Step 5: Make the Drawer Fronts |
|
|
172 | (4) |
|
Drawer Fronts: The Easy Way |
|
|
173 | (1) |
|
Drawer Fronts: The Hard Way |
|
|
174 | (1) |
|
Install the Drawer Fronts |
|
|
175 | (1) |
|
|
176 | (2) |
|
|
178 | (30) |
|
|
180 | (4) |
|
Step 1: Attaching the Mounting Plates |
|
|
181 | (1) |
|
Step 2: Tracking the Racks |
|
|
182 | (1) |
|
Step 3: Attaching Robe Hooks |
|
|
183 | (1) |
|
Build and Install a Medicine Cabinet |
|
|
184 | (10) |
|
Step 1: Designing the Cabinet |
|
|
185 | (2) |
|
Step 2: Cutting the Parts |
|
|
187 | (1) |
|
Step 3: Cutting the Dadoes |
|
|
187 | (1) |
|
Step 4: Assembling the Cabinet |
|
|
188 | (1) |
|
Step 5: Cutting the Doors |
|
|
189 | (1) |
|
Step 6: Finishing the Doors |
|
|
190 | (2) |
|
|
190 | (1) |
|
|
191 | (1) |
|
Install the Mirror and Mirror Backing |
|
|
191 | (1) |
|
Step 7: Mounting the Cabinet |
|
|
192 | (1) |
|
Step 8: Mounting the Door |
|
|
193 | (1) |
|
|
194 | (6) |
|
|
195 | (1) |
|
Step 2: Preparing the Drain and Attachment |
|
|
196 | (1) |
|
|
196 | (1) |
|
|
196 | (1) |
|
Step 3: Preparing the Water Supply |
|
|
197 | (2) |
|
|
198 | (1) |
|
Finish Attaching Bowl and Tank |
|
|
198 | (1) |
|
Step 4: Connect the Water Supply Line and Finish |
|
|
199 | (1) |
|
|
200 | (8) |
|
|
201 | (1) |
|
|
202 | (2) |
|
|
203 | (1) |
|
|
203 | (1) |
|
Connecting a One-Piece Fixture |
|
|
204 | (1) |
|
|
204 | (1) |
|
|
204 | (1) |
|
|
204 | (1) |
|
Remove and Replace the Sink |
|
|
204 | (1) |
|
|
205 | (3) |
|
Part 8: Electrical Matters |
|
|
208 | (38) |
|
Replace a Wall Light Fixture |
|
|
210 | (6) |
|
Step 1: Assessing Your Situation |
|
|
211 | (1) |
|
Step 2: Which Wire Is Hot? |
|
|
212 | (1) |
|
Step 3: The Ground Situation |
|
|
213 | (1) |
|
|
213 | (1) |
|
Making Ground Connections |
|
|
213 | (1) |
|
|
214 | (1) |
|
Step 5: Attaching the Light |
|
|
214 | (1) |
|
|
215 | (1) |
|
Install a Ceiling Light and Switch |
|
|
216 | (14) |
|
|
219 | (1) |
|
|
219 | (2) |
|
Step 3: Fishing the Wire Through the Wall |
|
|
221 | (1) |
|
|
221 | (1) |
|
|
222 | (1) |
|
|
222 | (1) |
|
Step 5: Repair the Damage |
|
|
223 | (1) |
|
Step 6: Connecting the Fixtures |
|
|
224 | (6) |
|
|
226 | (1) |
|
|
227 | (1) |
|
|
228 | (2) |
|
Add Lighting Under Kitchen Cabinets |
|
|
230 | (4) |
|
Step 1: Placing the Lights |
|
|
231 | (1) |
|
|
232 | (2) |
|
Upgrade to a Ground-Fault Outlet |
|
|
234 | (6) |
|
Step 1: Location, Location, Location |
|
|
235 | (1) |
|
Step 2: Shut Off the Circuit |
|
|
236 | (1) |
|
|
237 | (1) |
|
Step 4: Putting It Back Together |
|
|
238 | (2) |
|
Run TV Cable Through Walls |
|
|
240 | (6) |
|
Step 1: Finding the Best Route |
|
|
241 | (1) |
|
Step 2: Getting from Point A to Point B |
|
|
242 | (1) |
|
Step 3: Cable Connections |
|
|
243 | (2) |
|
Step 4: Repairing the Damage |
|
|
245 | (1) |
|
Part 9: For Decoration or for Fun |
|
|
246 | (65) |
|
|
248 | (6) |
|
|
249 | (1) |
|
Step 2: Going to Paint-Prep School |
|
|
250 | (1) |
|
Step 3: The Patching and Texturing Ceremony |
|
|
251 | (1) |
|
Step 4: Prime Time to Prime and Paint |
|
|
252 | (1) |
|
|
253 | (1) |
|
|
254 | (10) |
|
Step 1: Decisions, Decisions |
|
|
255 | (1) |
|
Step 2: Removing the Molding |
|
|
256 | (1) |
|
|
256 | (1) |
|
Step 4: Finish Before You Start |
|
|
257 | (1) |
|
Step 5: Starting Window Trim |
|
|
257 | (1) |
|
Step 6: Side and Top Casing, and Door Trim |
|
|
258 | (3) |
|
|
258 | (1) |
|
|
259 | (1) |
|
|
259 | (1) |
|
|
259 | (1) |
|
Finish Nailing the Casing |
|
|
260 | (1) |
|
|
261 | (3) |
|
|
264 | (6) |
|
Step 1: I Been Workin' on the Nailer |
|
|
265 | (1) |
|
Step 2: The Nailing Sequence |
|
|
266 | (1) |
|
Step 3: Make a Cutting Jig |
|
|
267 | (1) |
|
Step 4: Coping with Coping |
|
|
267 | (1) |
|
Step 5: Cutting Other Joints |
|
|
268 | (1) |
|
|
268 | (1) |
|
|
268 | (1) |
|
|
269 | (1) |
|
Replace a Fireplace Mantelpiece |
|
|
270 | (10) |
|
|
271 | (2) |
|
|
271 | (2) |
|
|
273 | (1) |
|
|
273 | (1) |
|
|
273 | (1) |
|
Step 3: Making the Mantel |
|
|
274 | (2) |
|
|
274 | (1) |
|
|
275 | (1) |
|
Step 4: The Crowning Touch |
|
|
276 | (1) |
|
|
277 | (3) |
|
|
280 | (8) |
|
|
282 | (1) |
|
|
282 | (2) |
|
|
282 | (2) |
|
|
284 | (1) |
|
|
284 | (1) |
|
|
284 | (1) |
|
|
285 | (3) |
|
Frame and Finish a Sleeping Loft |
|
|
288 | (23) |
|
|
290 | (1) |
|
Step 2: Structural Details |
|
|
290 | (2) |
|
|
290 | (2) |
|
|
292 | (1) |
|
|
292 | (2) |
|
|
293 | (1) |
|
|
294 | (1) |
|
|
294 | (3) |
|
|
295 | (1) |
|
|
296 | (1) |
|
Step 5: A Nonpolitical Platform |
|
|
297 | (1) |
|
|
297 | (3) |
|
|
297 | (1) |
|
|
298 | (2) |
|
|
|
|
300 | (7) |
|
|
307 | (4) |
Index |
|
311 | |