|
|
1 | (6) |
|
|
2 | (1) |
|
|
3 | (1) |
|
|
4 | (1) |
|
Emphasis on Construction Practices |
|
|
4 | (1) |
|
|
5 | (2) |
|
Soil Mechanics For Pipeline Constructors |
|
|
7 | (26) |
|
|
7 | (3) |
|
|
10 | (2) |
|
Describing a Soil Mixture |
|
|
12 | (6) |
|
|
18 | (2) |
|
|
20 | (3) |
|
|
23 | (3) |
|
|
26 | (1) |
|
|
27 | (2) |
|
Interaction of the Soil and the Pipe Structure |
|
|
29 | (4) |
|
Describing Common Procedures |
|
|
33 | (2) |
|
Obtaining Pipe From A Supplier |
|
|
35 | (2) |
|
|
37 | (4) |
|
Excavation And Backfilling |
|
|
41 | (38) |
|
|
41 | (2) |
|
Excavation of a Pipe Trench: The First Phase of Pipeline Earthwork |
|
|
43 | (15) |
|
Other Important Earthwork Decisions |
|
|
58 | (4) |
|
|
62 | (6) |
|
Embedding the Pipe: The Second Phase of Pipeline Earthwork |
|
|
68 | (6) |
|
Problem Conditions during Backfilling |
|
|
74 | (1) |
|
Completing the Trench: The Third Phase of Pipeline Earthwork |
|
|
75 | (1) |
|
|
76 | (3) |
|
Pipe Shipping And Handling |
|
|
79 | (6) |
|
Controlling Pipe Delivery |
|
|
79 | (6) |
|
General Installation For All Pipes |
|
|
85 | (10) |
|
|
85 | (1) |
|
General Pipe Installation |
|
|
86 | (1) |
|
Handling and Operational Issues |
|
|
86 | (3) |
|
|
89 | (1) |
|
Reaction or Thrust Blocking |
|
|
90 | (1) |
|
|
90 | (1) |
|
Installation in Casings and Tunnels |
|
|
91 | (1) |
|
|
92 | (1) |
|
|
92 | (1) |
|
Measurement of Pipe Deformation |
|
|
92 | (1) |
|
|
93 | (2) |
|
General Installation Procedures |
|
|
95 | (4) |
|
|
99 | (16) |
|
General Background and Discussion |
|
|
99 | (2) |
|
|
101 | (4) |
|
|
105 | (2) |
|
Pipe Shipping and Handling |
|
|
107 | (1) |
|
|
108 | (4) |
|
|
112 | (1) |
|
|
113 | (2) |
|
|
115 | (8) |
|
General Background and Discussion |
|
|
115 | (2) |
|
|
117 | (1) |
|
Installation of Corrugated Metal Pipe |
|
|
118 | (3) |
|
|
121 | (2) |
|
|
123 | (20) |
|
General Background and Discussion |
|
|
123 | (1) |
|
|
124 | (3) |
|
A Sample Project to Describe Ductile Iron Pipe Installation |
|
|
127 | (1) |
|
Delivering Pipe to the Job Site |
|
|
128 | (3) |
|
|
131 | (5) |
|
|
136 | (1) |
|
Connections to Structures |
|
|
137 | (1) |
|
Installing in Tunnels and Casings |
|
|
137 | (1) |
|
|
138 | (2) |
|
|
140 | (2) |
|
|
142 | (1) |
|
Prestressed Concrete Cylinder Pipe |
|
|
143 | (14) |
|
General Background and Discussion |
|
|
143 | (2) |
|
|
145 | (3) |
|
|
148 | (1) |
|
|
149 | (1) |
|
|
150 | (7) |
|
|
157 | (16) |
|
General Background and Discussion |
|
|
157 | (1) |
|
Description of Reinforced Concrete Pipe |
|
|
158 | (6) |
|
A Sample Project to Illustrate Actual Installation Work |
|
|
164 | (9) |
|
Bar-Wrapped Concrete Cylinder Pipe |
|
|
173 | (14) |
|
General Background and Discussion |
|
|
173 | (1) |
|
|
174 | (4) |
|
|
178 | (1) |
|
|
179 | (5) |
|
|
184 | (1) |
|
|
185 | (2) |
|
|
187 | (8) |
|
General Background and Discussion |
|
|
187 | (1) |
|
|
188 | (1) |
|
|
189 | (5) |
|
|
194 | (1) |
|
|
195 | (16) |
|
General Background and Discussion |
|
|
195 | (2) |
|
Receiving, Storage, and Handling |
|
|
197 | (2) |
|
|
199 | (7) |
|
|
206 | (5) |
|
|
211 | (20) |
|
General Background and Discussion |
|
|
211 | (6) |
|
Shipping and Handling Polyethylene Pipe |
|
|
217 | (2) |
|
Installation of Polyethylene Pipe |
|
|
219 | (9) |
|
|
228 | (3) |
|
Fiberglass-Reinforced (Thermosetting Resin) Plastic Pipe |
|
|
231 | (20) |
|
|
231 | (1) |
|
|
232 | (2) |
|
Shipping and Handling Fiberglass Pipe |
|
|
234 | (2) |
|
Unloading and Handling Pipe |
|
|
236 | (1) |
|
|
237 | (2) |
|
|
239 | (1) |
|
|
240 | (1) |
|
|
241 | (1) |
|
Pipe Placement and Assembly |
|
|
241 | (1) |
|
|
242 | (1) |
|
Field Cutting of Fiberglass Pipe |
|
|
242 | (1) |
|
Installation in Tunnels, Casings, and for Sliplining |
|
|
242 | (2) |
|
Pipe Jacking and Microtunneling |
|
|
244 | (1) |
|
Other Considerations during Pipe Laying |
|
|
245 | (1) |
|
Use of Temporary Trench Shoring |
|
|
245 | (1) |
|
Trench Construction in Rock |
|
|
246 | (1) |
|
Thrust Blocks, Concrete Encasement, Rigid Connections |
|
|
246 | (2) |
|
|
248 | (1) |
|
|
249 | (2) |
Appendix A Excavator's Checklist |
|
251 | (4) |
Appendix B Industry Organizations |
|
255 | (6) |
Appendix C Modified Iowa Formula |
|
261 | (2) |
Index |
|
263 | |