|
Modeling Tools and Techniques: Common Cause Failures |
|
|
|
Development and Structure of the German Common Cause Failure Data Pool (PSAM-0020) |
|
|
1 | (1) |
|
|
|
|
|
Impact of CCF Assumptions on PSA and PSA Application Calculations (PSAM-0172) |
|
|
2 | (1) |
|
|
|
|
An Efficient Approach for the Reliability Analysis of Phased-Mission Systems with Dependent Failures (PSAM-0206) |
|
|
3 | (1) |
|
|
|
|
Electric Power and Nuclear Systems I: Level 1 PSA |
|
|
|
A PSA Update to Reflect Procedural Changes (PSAM-0217) |
|
|
4 | (1) |
|
|
|
|
|
|
Oil Spill Risk Assessment for Loviisa Power Plant (PSAM-0388) |
|
|
5 | (1) |
|
|
|
|
PSA Level 1 - NPP Ringhals 2 (PSAM-0155) |
|
|
6 | (1) |
|
|
|
|
|
Assessment of Risk of Severe Accidents of All Modes of Operation at Novovoronezh 5- Nuclear Power Plant (PSAM-0356) |
|
|
7 | (1) |
|
|
|
|
|
|
Risk-Informed Decision Making: Perspectives on Risk-Informed Regulations |
|
|
|
Expanded Application of PSA to Nuclear Power Plants - A Progress Report (PSAM-0227) |
|
|
8 | (1) |
|
|
The Use of Risk in the Regulation of Hazards in the UK (PSAM-0041) |
|
|
9 | (1) |
|
|
Risk Informed Approach for the Safety Analysis of French Nuclear Power Plants (PSAM-0452) |
|
|
10 | (1) |
|
|
Medical and Health: Application of PRA Methodologies to Health Care |
|
|
|
PRA & Patient Safety: A Trial Application to the Risks of Organ Mismatches in Transplantation (PSAM-0323) |
|
|
11 | (1) |
|
|
|
|
A Procedure for using FMECA to Assess High-Risk Healthcare Processes (PSAM-0266) |
|
|
12 | (1) |
|
|
Analyzing Medical Incident Reports in the Context of Medical Care Processes (PSAM-0302) |
|
|
13 | (1) |
|
|
|
|
Modeling Risk in Complex Medical Domains: Understanding `Hidden' Interactions and Variations Across Different Phases of Care (PSAM-0417) |
|
|
14 | (1) |
|
|
|
Aerospace: Shuttle PRA Modeling and Applications |
|
|
|
Space Shuttle Probabilistic Risk Assessment Overview (PSAM-0230) |
|
|
15 | (1) |
|
|
|
|
|
PRA Applications in Space Shuttle Program Risk Management (PSAM-0467) |
|
|
16 | (1) |
|
|
Likelihood Assessment of Wire-to-Wire Shorts Causing Uncommanded RCS Firing While the Orbiter is Docked at the ISS (PSAM-0019) |
|
|
17 | (1) |
|
|
|
Emergency Management: Tools for Emergency Response |
|
|
|
Human-in-the-Loop Simulation of Organizational Behavior in Emergency Response (PSAM-0127) |
|
|
18 | (1) |
|
|
|
|
Guidelines for Cross-Border Tunnel Incident Management in the European Union (PSAM-0107) |
|
|
19 | (1) |
|
|
|
Using Cell Broadcast in Citizens Warning: Characteristics of Messages (PSAM-0236) |
|
|
20 | (1) |
|
|
|
|
|
A Multi-Objective Optimization Model for Developing Emergency Evacuation Plans (PSAM-0466) |
|
|
21 | (1) |
|
|
|
|
|
Modeling Tools and Techniques: Quantitative Risk Modeling I |
|
|
|
Using Uncertainty Information in Level 3 PRA Calculations (PSAM-0233) |
|
|
22 | (1) |
|
|
|
|
|
|
Some General Insights Regarding Development of NPP Dukovany PSA Input Parameters Set Made on the Base of Broad Analysis of Operational Experience (PSAM-0066) |
|
|
23 | (1) |
|
|
Electric Power and Nuclear Systems II: Level 1 PSA Quality Improvement |
|
|
|
Improving Quality of NPP PSA by International Comparisons (PSAM-0265) |
|
|
24 | (1) |
|
|
|
|
|
|
|
|
Application of CENS Concept for International Peer Review to Probabilistic Safety Assessment (Level 1) of Swiss Gosgen Nuclear Power Plant (PSAM-0248) |
|
|
25 | (1) |
|
|
|
|
|
|
Probabilistic Modeling of Aircraft Crash and Impact on Ignalina NPP Considering Uncertainty (PSAM-0471) |
|
|
26 | (1) |
|
|
|
|
|
Human Reliability: Analyzing Human Actions in PRA |
|
|
|
Multidimensional Confusability Matrices Enhance Systematic Analysis of Unsafe Actions and Human Failure Events Considered in PSAs of Nuclear Power Plants (PSAM-0334) |
|
|
27 | (1) |
|
|
A Method for Human Reliability Assessment Based on Bayesian Networks (PSAM-0443) |
|
|
28 | (1) |
|
|
|
|
|
Analysis of Human Actions in the Framework of Dynamic Reliability Analysis (PSAM-0040) |
|
|
29 | (1) |
|
|
|
Risk-Informed Decision Making: Strategic Decision Making I |
|
|
|
Implementation Issues on Citizens Alarming Using Mobile Phone Technology (PSAM-0237) |
|
|
30 | (1) |
|
|
|
|
|
Application of Risk Methods to Assess Air Force Capabilities (PSAM-0084) |
|
|
31 | (1) |
|
|
|
|
|
|
|
Societal Risk Around Amsterdam Airport Schiphol; Air Traffic Developments and Spatial Planning Between 1990 and 2005 (PSAM-0130) |
|
|
32 | (1) |
|
|
|
|
Risk Insights for Use in the U.S. Nuclear Regulatory Commission's Program for the Potential Yucca Mountain Repository (PSAM-0289) |
|
|
33 | (1) |
|
|
|
|
|
|
|
Medical and Health: Risk Applications with Radiological Medical Materials |
|
|
|
A Human Reliability-Centered Approach to the Development of Job Aids for Reviewers of Medical Devices that Use Radiological Byproduct Materials (PSAM-299) |
|
|
34 | (1) |
|
|
|
|
First Results from a Probabilistic Risk Assessment for PSI's Spot-Scanning Proton Therapy Facility (PSAM-390) |
|
|
35 | (1) |
|
|
|
|
|
Applying PSA to Radiation Source Facilities and Practices -- Results and Recommendations from an IAEA Coordinated Research Project (PSAM-0385) |
|
|
36 | (1) |
|
|
|
Aerospace: Shuttle PRA Modeling and Applications 2 |
|
|
|
Common Cause Case Study -- An Estimated Probability of Four Solid Rocket Booster Hold-Down Post Stud Hang-ups (PSAM-0372) |
|
|
37 | (1) |
|
|
Probabilistic Seal Leak Analysis for Space Shuttle External Tank (PSAM-0192) |
|
|
38 | (1) |
|
|
|
Space Shuttle External Tank Probabilistic Risk Assessment - Risk Logic Development and Quantification of the Welds (PSAM-0226) |
|
|
39 | (1) |
|
|
|
|
Emergency Management: Risk in Emergency Planning and Response |
|
|
|
Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management (PSAM-0456) |
|
|
40 | (1) |
|
|
|
Using Bayesian Belief Networks to Predict Radioactive Releases after a Severe Accident in a BWR (PSAM-0144) |
|
|
41 | (1) |
|
|
|
|
Risk & Emergency Zoning Around Nuclear Power Plants and Other Major Hazardous Industrial Installations (PSAM-0365) |
|
|
42 | (1) |
|
|
|
Uncertainty Analyses and Emergency Risk Zoning for NPPS (PSAM-0038) |
|
|
43 | (1) |
|
|
Modeling Tools and Techniques: Quantitative Risk Modeling II |
|
|
|
Developments in Importance Measures for Risk-informed ranking and other Applications (PSAM-0049) |
|
|
44 | (1) |
|
|
Two Types of Priority and Gates and their Markov Analyses (PSAM-0123) |
|
|
45 | (1) |
|
|
|
|
|
Using Functional Transitions and Kronecker Algebra for Availability Evaluation of Parallel Systems Under Repair Policies (PSAM-0418) |
|
|
46 | (1) |
|
|
|
Analytical Results on the Evaluation of Lead Time and Fill Rate of Unreliable Production Systems (PSAM-0419) |
|
|
47 | (1) |
|
|
Nuclear: Electric Power and Nuclear Systems II: Level 2 PSA |
|
|
|
PSA Level 2 - NPP Ringhals 2 (PSAM-0156) |
|
|
48 | (1) |
|
|
|
|
|
Modeling of SAMG Operator Actions in Level 2 PSA (PSAM-0164) |
|
|
49 | (1) |
|
|
Source Term Assessments in PSA Level 2 for the Outage Period (PSAM-0168) |
|
|
50 | (1) |
|
|
|
Link Between Level 2 PSA and Off-Site Emergency Preparedness (PSAM-0363) |
|
|
51 | (1) |
|
|
|
|
|
Human Reliability: Human Performance Modeling |
|
|
|
Human Error Prediction in ATM via Cognitive Simulation: Preliminary Study (PSAM-0268) |
|
|
52 | (1) |
|
|
|
|
Guidelines for Assessing Diagnosis Failures for a Flowchart-Based Diagnostic Procedure (PSAM-0291) |
|
|
53 | (1) |
|
|
|
|
Nuclear Power Plant Crew Problem-Solving Behavior According to IDAC (PSAM-0405) |
|
|
54 | (1) |
|
|
|
|
Task Analysis and Cognitive Process Modelling of a Controller in En Route Air Traffic Control (PSAM-0131) |
|
|
55 | (1) |
|
|
|
|
|
Risk-Informed Decision Making: Strategic Decision Making II |
|
|
|
A Process for Risk-Informed Decision-Making (PSAM-0088) |
|
|
56 | (1) |
|
|
|
|
|
|
Prevention of the Major Industrial Accidents: About the Interest of Using Diagrams Influence in Risk Prevention Process (PSAM-0332) |
|
|
57 | (1) |
|
|
Risk Perception and Strategic Decision Making: a New Framework for Understanding and Mitigating Biases with Examples Tailored to the Nuclear Power Industry (PSAM-0333) |
|
|
58 | (1) |
|
|
Semi-Quantitative Risk Assessment Supporting Decisions for Control Center Changeover (PSAM-0408) |
|
|
59 | (1) |
|
|
|
Environmental: Environmental |
|
|
|
Network Structure Changes in Food Webs: Implications to Ecological Risk Assessment (PSAM-0062) |
|
|
60 | (1) |
|
|
|
A Study on an Accident Diagnosis Methodology Using Influence Diagrams (PSAM-0261) |
|
|
61 | (1) |
|
|
|
Sustainability of Current Electricity Supply Technologies: A Comparative Evaluation (PSAM-0395) |
|
|
62 | (1) |
|
|
|
|
|
|
|
Aerospace: PRA Applications for New Exploration Systems |
|
|
|
Launch Architecture Impact on Ascent Abort and Crew Survival (PSAM-0209) |
|
|
63 | (1) |
|
|
|
Risk in Conceptual Design Trades: A Crew Exploration Vehicle (CEV) Propulsion System Example (PSAM-0475) |
|
|
64 | (1) |
|
|
Probabilistic Risk Assessment Data for Space Missions (PSAM-0455) |
|
|
65 | (1) |
|
|
|
An Intelligent Agent-Oriented Approach to Risk Analysis of Complex Dynamic Systems with Applications in Planetary Missions (PSAM-0202) |
|
|
|
Mohammadreza Azarkhail and Mohammad Modarres |
|
|
66 | (1) |
|
Emergency Management: Risk in Emergency Management |
|
|
|
Evaluation of Alternative Emergency Strategies for Nuclear Power Plants using the WinMACCS Code (PSAM-0256) |
|
|
67 | (1) |
|
|
|
|
|
Current Applications of PRA in Emergency Management: A Literature Review (PSAM-0325) |
|
|
68 | (1) |
|
|
Towards More Secure Virtual Organizations by Implementing a Common Scheme for Incident Response Management (PSAM-0457) |
|
|
69 | (1) |
|
|
|
|
A Brief Comparison of Life Loss due to Floods, Hurricanes, Earthquakes and Terrorist Attacks (PSAM-0473) |
|
|
70 | (1) |
|
|
Modeling Tools and Techniques: PSA Tools I |
|
|
|
Storybuilder: The New Interface for Accident Analysis (PSAM-0044) |
|
|
71 | (1) |
|
|
|
|
|
|
|
|
|
Evaluation of Test Interval Strategies with a Risk Monitor (PSAM-0166) |
|
|
72 | (1) |
|
|
|
SAPHIRE - Past, Present, and Future (PSAM-0279) |
|
|
73 | (1) |
|
|
|
Nuclear: Electric Power and Nuclear Systems II |
|
|
|
Insights and Results of the Shutdown PSA for a German SWR 69 Type Reactor (PSAM-0028) |
|
|
74 | (1) |
|
|
|
|
Probabilistic Safety Assessment for Low-Power and Shutdown States for LVNPP (PSAM-0092) |
|
|
75 | (1) |
|
|
|
Risk Assessment of the Bohunice V1 NPP Units for the State After Termination of the Unit 1 Operation (PSAM-0476) |
|
|
76 | (1) |
|
|
|
|
Analysis of Shutdown Mode at Barseback 2; An Approach to a Combined PSA, HFA and Deterministic Analysis (PSAM-0117) |
|
|
77 | (1) |
|
|
|
|
Human Reliability: Simulator-Based Approaches to Human Reliability |
|
|
|
Applicability of the HRA Methods for External Event PSA Based on Simulator Training (PSAM-0337) |
|
|
78 | (1) |
|
|
|
|
|
Analysis of Simulator Data for HRA Purposes (PSAM-0037) |
|
|
79 | (1) |
|
|
|
|
|
|
Evaluation Method of Bridge Team Performance Using Task-Network Simulation (PSAM-0343) |
|
|
80 | (1) |
|
|
|
|
A Study on How Time Pressure and Information Load Affects Operators Performance in Accident Scenarios (PSAM-0344) |
|
|
81 | (1) |
|
|
|
|
|
Risk-Informed Decision Making: Perspectives on Risk-Informed Regulations |
|
|
|
Risk Informed Uncertainty (PSAM-0145) |
|
|
82 | (1) |
|
|
A Proposed Risk-Informed Decision-Making Framework for NASA (PSAM-0368) |
|
|
83 | (1) |
|
|
|
|
Application of Risk Management as a Cornerstone in Ensuring Nuclear Plant Safety (PSAM-0477) |
|
|
84 | (1) |
|
|
|
Risk Communication: Risk Communication Methods I |
|
|
|
Helping Experts Communicate with Their Public (PSAM-0013) |
|
|
85 | (1) |
|
|
Expert and General Public Perceptions of Risks: Perplex Study (PSAM-0076) |
|
|
86 | (1) |
|
|
|
UD Approach to Risk Communication (PSAM-0099) |
|
|
87 | (1) |
|
|
|
Effects of Network Structure on Public Opinion Development (PSAM-0116) |
|
|
88 | (1) |
|
|
|
Aerospace: Aviation Safety |
|
|
|
Risk Management, Procedure Governing Flights in Airport Vicinity (PSAM-0136) |
|
|
89 | (1) |
|
|
|
|
SAND: Safety Assessment for New Air Traffic Concept Exploration (PSAM-0032) |
|
|
90 | (1) |
|
|
On the Effects of ADS Along-Track Position Estimation Errors on Longitudinal Collision Risk (PSAM-0342) |
|
|
91 | (1) |
|
|
Modeling of the Processes in the Airport Area (PSAM-0468) |
|
|
92 | (1) |
|
|
Modeling Tools and Techniques: PSA Tools III |
|
|
|
Quantified Area Risk Assessment: From the ARIPAR Methodology to the Related Software Tools (PSAM-0222) |
|
|
93 | (1) |
|
|
|
|
|
|
|
|
|
HazardPro - A Semi Quantitative, Computer Based Approach to Simplify Hazard and Risk Analysis (PSAM-0124) |
|
|
94 | (1) |
|
|
|
|
Modeling Accidents for Prioritising Prevention (PSAM-0102) |
|
|
95 | (1) |
|
|
|
|
|
|
|
|
|
Tracking Hazard Analysis Data in a Jungle of Changing Design (PSAM-0460) |
|
|
96 | (1) |
|
|
|
Nuclear: Seismic Analyses |
|
|
|
Analysis of Accident Progression and Source Terms in Seismic Events for BWR-4 Plant (PSAM-0053) |
|
|
97 | (1) |
|
|
|
|
Effects of Recent U.S. Seismic Hazard Studies on New Nuclear Power Plant Design Criteria (PSAM-0087) |
|
|
98 | (1) |
|
|
|
|
|
Accident Sequence Study for Seismic Event at the Multi-Unit Site (PSAM-0387) |
|
|
99 | (1) |
|
|
|
|
|
Human Reliability: Human Reliability Data Sources and Applications I |
|
|
|
Framework for the Human Event Repository and Analysis (HERA) System and its use to Quantify Human Actions (PSAM-0224) |
|
|
100 | (1) |
|
|
|
|
|
|
Generation of Human Reliability Data for the Air Traffic Industry (PSAM-0030) |
|
|
101 | (1) |
|
|
|
|
|
|
A Couple of Points to the Discussion about Factors Influencing Human Reliability (PSAM-0065) |
|
|
102 | (1) |
|
|
|
The Fidelity of Operators' Performance Data Observed Under Simulated Emergencies of Nuclear Power Plants (PSAM-0293) |
|
|
103 | (1) |
|
|
|
|
Risk-Informed Decision Making: Regulatory Decisions |
|
|
|
Use of PSA in Licensing of EPR 1600 in Finland (PSAM-0160) |
|
|
104 | (1) |
|
|
|
|
|
Use of the PSA in the Integrated Regulatory Safety Oversight in Swtizerland: Status and Outlook (PSAM-0181) |
|
|
105 | (1) |
|
|
|
|
Risk Insights Baseline Report: A Basis for Risk-Informed Decision Making in the U.S. Nuclear Regulatory Commission's High-Level Waste Repository Safety Program for the Proposed Yucca Mountain, Nevada Repository (PSAM-0304) |
|
|
106 | (1) |
|
|
Development of Multi-Purpose PSA Model for Regulatory Uses (PSAM-0407) |
|
|
107 | (1) |
|
|
Risk Communication: Risk Communication Applications |
|
|
|
Analyzing the IRSN Risk Perception Barometer over the 1997-2004 Period (PSAM-0077) |
|
|
108 | (1) |
|
|
|
Managing Safety Proactively - Experiences on the Implementation of the Safety Agenda at Eurocontrol (PSAM-0269) |
|
|
109 | (1) |
|
|
Proposal of New Scheme of Science Communication through Repetitive Dialogue Forums (PSAM-0120) |
|
|
110 | (1) |
|
|
|
|
Aerospace: Flight Trajectory Risk Assessment |
|
|
|
Probabilistic Assessment of Vehicle Launch Abort Trajectories (PSAM-0196) |
|
|
111 | (1) |
|
|
|
Application of Probabilistic Methods for the Analysis of Space Shuttle Launch Area Risk (PSAM-0374) |
|
|
112 | (1) |
|
|
|
|
|
Security: Methods to Evaluate Proliferation Resistance |
|
|
|
Methodology for Proliferation Resistance for Advanced Nuclear Energy Systems (PSAM-0450) |
|
|
113 | (1) |
|
|
|
|
A Comparison of the Safety Analysis Process and the Generation IV Proliferation Resistance/Physical Protection Assessment Methodology (PSAM-0353) |
|
|
114 | (1) |
|
|
|
Quantitative Approach to Assessment of Nuclear Fuel Cycle Materials Attractiveness (PSAM-0247) |
|
|
115 | (1) |
|
|
|
|
Evaluation Methodology for Proliferation Resistance and Physical Protection of Generation IV Nuclear Energy Systems, an Overview (PSAM-0286) |
|
|
116 | (1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Modeling Tools and Techniques: Modeling Using Network-Diagram Methods I |
|
|
|
An Algorithm for the Quantification of Hybrid Causal Logic Models (PSAM-0339) |
|
|
117 | (1) |
|
|
|
Fault Diagnosis of Nuclear Components by Kohonen Self-Organizing Maps (PSAM-0068) |
|
|
118 | (1) |
|
|
|
The Methodology to Build the Network Used in a Bayesian Belief Net Approach (PSAM-0025) |
|
|
119 | (1) |
|
|
|
|
Nuclear: Fire and Flooding Analysis |
|
|
|
Development of Risk Assessment Method for Fire Caused by Earthquake (IV) (PSAM-0128) |
|
|
120 | (1) |
|
|
|
|
Fire PSA for a German BWR (BWR-69 Type) - Methodology Applied and Results (PSAM-0052) |
|
|
121 | (1) |
|
|
|
|
|
|
Integrating Insights from the Fire PRA Methodology for Nuclear Power Facilities into the Fire Protection SDP (PSAM-0305) |
|
|
122 | (1) |
|
|
|
|
|
Human Reliability: Human Reliability Data Sources and Applications II |
|
|
|
Methodology for Improving HRA by Simulator Studies (PSAM-0391) |
|
|
123 | (1) |
|
|
|
|
|
Developing Human Performance Measures (PSAM-0207) |
|
|
124 | (1) |
|
|
|
|
|
|
Risk-Informed Decision Making: Occupational Risk |
|
|
|
ORM: Development of an Integrated Method to Assess Occupational Risk (PSAM-0033) |
|
|
125 | (1) |
|
|
|
|
|
|
|
|
|
|
|
|
Decision-Making in Oil/Gas Well Engineering (PSAM-0081) |
|
|
126 | (1) |
|
|
|
Information Technology: Challenges in Risk and Reliability Modeling of Digital Systems |
|
|
|
Nuclear Power Plant Digital System PRA Pilot Study with the Dynamic Flowgraph Methodology (PSAM-0110) |
|
|
127 | (1) |
|
|
|
|
|
How Time-Related Failures Affect the Software System (PSAM-0200) |
|
|
128 | (1) |
|
|
|
|
USNRC Research Program and Preliminary Results of PRA Modeling of Digital I&C Systems (PSAM-0329) |
|
|
129 | (1) |
|
|
|
|
|
|
|
|
Simulation Assisted Risk Assessment: Blast Overpressure Modeling (PSAM-0197) |
|
|
130 | (1) |
|
|
|
|
|
Improvement of JEM Operation by PSA (PSAM-0139) |
|
|
131 | (1) |
|
|
|
|
|
|
|
|
Security: Risk and Terrorism |
|
|
|
Evaluation of Terrorist Risk using Belief and Plasuibility (PSAM-0384) |
|
|
132 | (1) |
|
|
An Example of the Quantification of the Increase of Risk Level due to Terrorist Attacks in the Transportation of Dangerous Goods (PSAM-0432) |
|
|
133 | (1) |
|
|
|
|
Integrating Incident Reporting in Risk Analysis (PSAM-0330) |
|
|
134 | (1) |
|
|
|
Risk Analysis and Society: A Capability-Based Account of the Consequences of Natural or Man-Made Disasters (PSAM-0426) |
|
|
135 | (1) |
|
|
|
Modeling Tools and Techniques: Modeling Using Network Diagram Methods II |
|
|
|
Petri Net Simulation of Consumables Aboard the International Space Station (PSAM-0109) |
|
|
136 | (1) |
|
|
|
|
|
|
Predicting the Resistance of Power Cables to Flame Propagation by Neural Networks (PSAM-0069) |
|
|
137 | (1) |
|
|
|
|
Functional Block Diagrams and Automated Construction of Event Trees (PSAM-0057) |
|
|
138 | (1) |
|
|
|
Analysis of Event Trees with Dependent Branches Using Bayesian Networks (PSAM-0024) |
|
|
139 | (1) |
|
Seyed Mohammad Hadi Hosseini |
|
|
|
Nuclear: Input Data for PSA |
|
|
|
Requirements on Databases and Input Data to PSA (PSAM-0074) |
|
|
140 | (1) |
|
|
LOCA Frequencies Estimated from Operating Experience (PSAM-0282) |
|
|
141 | (1) |
|
|
Elaboration of Reliability Data for Aging PSA (PSAM-0154) |
|
|
142 | (1) |
|
|
Development of a Reliability Data Handbook for Piping Components in Nordic Nuclear Power Plants (PSAM-0063) |
|
|
143 | (1) |
|
|
|
|
Human Reliability: Human Error Dependency and Taxonomy |
|
|
|
Simplified Methodology for Dependence Among Operator Actions for a Nuclear Plant PRA Model (PSAM-0198) |
|
|
144 | (1) |
|
|
|
Discussion on Modeling Errors of Commission and Omission (PSAM-0296) |
|
|
145 | (1) |
|
|
Integrating Human Reliability Analysis Approaches in the ERPI HRA Calculator (PSAM-0430) |
|
|
146 | (1) |
|
|
|
Risk-Informed Decision Making: Risk Management |
|
|
|
Integrated Risk Management A New Approach to Link Different Aspects of Risk (PSAM-0126) |
|
|
147 | (1) |
|
|
|
Development and Application of the Total Risk Assessment Tool by Effective Feedbacks for Preventing Anomalies (PSAM-0239) |
|
|
148 | (1) |
|
|
|
|
|
|
Proactive Hazard Management of Deactivation and Decommissioning at a DOE Nuclear Facility (PSAM-0366) |
|
|
149 | (1) |
|
|
|
|
Information Technology: Data Estimation, Empirical Studies and Risk Assessment |
|
|
|
Estimation of Failure Rates of Digital Components Using a Hierarchal Bayesian Method (PSAM-0320) |
|
|
150 | (1) |
|
|
|
Safety vs. Security? (PSAM-0148) |
|
|
151 | (1) |
|
|
|
|
|
Coupling the Ant Colony and the Degraded Ceiling Algorithm for the Redundancy Allocation Problem (PSAM-0421) |
|
|
152 | (1) |
|
|
|
|
Software Modeling in a Dynamic PRA Environment (PSAM-0420) |
|
|
153 | (1) |
|
|
|
|
|
|
A Dynamic Risk Assessment of Space Shuttle Two Engine Out Contingency Abort Scenarios (PSAM-0095) |
|
|
154 | (1) |
|
|
|
|
|
Extension of the Dynamic Abort Risk Evaluator (DARE) to Shuttle Derived Launch Vehicles (PSAM-0094) |
|
|
155 | (1) |
|
|
|
|
|
QRAS Approach to Phased Mission Analysis (PSAM-0444) |
|
|
156 | (1) |
|
|
|
Modeling Tools and Techniques: Sensitivity Analysis |
|
|
|
Efficient Estimation of the High Dimensional Model Representation for Non-Linear Models (PSAM-0402) |
|
|
157 | (1) |
|
|
|
|
A Smart Sampling Strategy for One-at-a-Time Sensitivity Experiments (PSAM-0360) |
|
|
158 | (1) |
|
|
|
|
Techniques for Sensitivity Analyses on Non-Monotonic Functions (PSAM-0378) |
|
|
159 | (1) |
|
|
|
Nuclear: Model and Data Uncertainty |
|
|
|
A General Thermal Hydraulics Uncertainty Analysis Methodology (PSAM-0422) |
|
|
160 | (1) |
|
|
|
|
The Effect of Conservatism on Identifying Influential Parameters (PSAM-0381) |
|
|
161 | (1) |
|
|
|
Method of Level 2 PSA Uncertainty Study for NPP PAKS (PSAM-0470) |
|
|
162 | (1) |
|
|
|
|
|
|
|
Human Reliability: Application of Human Reliability in PRA I |
|
|
|
Human Reliability Analysis (HRA) Method Evaluation Based on the Good Practices in NUREG-1792 (PSAM-0415) |
|
|
163 | (1) |
|
|
|
|
Pre-accidental Situations Highlighted by RECUPERARE Method and Data (PSAM-0029) |
|
|
164 | (1) |
|
|
Recovery from Equipment Failures in Air Traffic Control: A Probabilistic Assessment of the Context (PSAM-0267) |
|
|
165 | (1) |
|
|
|
|
Risk-Informed Decision Making: Risk-Informed Operations |
|
|
|
Safety Assessment Tool Developed for Nuclear Fuel Handling Facilities (PSAM-0436) |
|
|
166 | (1) |
|
|
|
|
|
|
Leading Indicators for Major Hazard Risk in Offshore Petroleum Operations (PSAM-0002) |
|
|
167 | (1) |
|
|
Torleif Husebø Terje Aven |
|
|
|
|
A Risk-Monitoring System Hybridized of that for Outage-Plan Management (PSAM-0307) |
|
|
168 | (1) |
|
|
|
|
|
Modeling Tools and Techniques: Dynamic Modeling Methods I |
|
|
|
The Advanced Logical Dynamics Safety Assessment Using System Dynamics Method of Auxiliary Feed Water Systems (PSAM-0260) |
|
|
169 | (1) |
|
|
|
Reliability Analyses of a Self-Holding Type Relay System by a Dynamical Event Tree and the GO-FLOW Methodology (PSAM-0214) |
|
|
170 | (1) |
|
|
Constructing Dynamic Event Trees from Markov Models (PSAM-0369) |
|
|
171 | (1) |
|
|
|
|
|
|
Aerospace: Phased Mission Analysis I |
|
|
|
Space Propulsion System Phased-Mission Probability Analysis Using Conventional PRA Methods (PSAM-0252) |
|
|
172 | (1) |
|
|
|
Solution of the Phased-Mission Benchmark Problem Using the SimPRA Dynamic PRA Approach (PSAM-0345) |
|
|
173 | (1) |
|
|
|
|
|
Advanced PRA Tool Benchmark for Space System Risk using the Dynamic Flowgraph Methodology (PSAM-0111) |
|
|
174 | (1) |
|
|
|
|
|
Security: Safety, Security and Risk |
|
|
|
European Commission Initiative on Safety and Security of Energy Infrastructures in a Comparative View (PSAM-0035) |
|
|
175 | (1) |
|
|
|
Screening Vulnerabilities in Water-Supply Networks (PSAM-0250) |
|
|
176 | (1) |
|
|
|
Security Vulnerabilities Analysis at Chemicals Facility (PSAM-0449) |
|
|
177 | (1) |
|
|
|
Modeling Tools and Techniques: Bayesian Methods for Reliability Assessment I |
|
|
|
Space Shuttle Main Engine Probabilistic Risk Assessment - An Alternative Bayesian Approach For Estimating Engine Level Risks (PSAM-0194) |
|
|
178 | (1) |
|
|
|
|
|
Application of Bayes Linear Methods to Reliability (PSAM-0263) |
|
|
179 | (1) |
|
|
|
|
Constrained Noninformative Priors with Uncertain Constraints: A Hierarchical Simulation Approach (PSAM-0437) |
|
|
180 | (1) |
|
|
Nuclear: PSA Applications I |
|
|
|
Risk-Based Precursor Analysis in the Nuclear Industry - Experiences on the National and the International Scene (PSAM-0026) |
|
|
181 | (1) |
|
|
Risk Based Analysis of Reactor Operating Experience (PSAM-0271) |
|
|
182 | (1) |
|
|
|
|
|
Application of PRA Methodology to ECCS Suction Strainers Blockage Issue (PSAM-0152) |
|
|
183 | (1) |
|
|
|
|
Human Reliability: Individual Factors Influencing Human Reliability |
|
|
|
Methodology to Quantify the Benefit Associated with a Reduction in Worker Fatigue as a Result of Altered Work Schedules in the Nuclear Industry (PSAM-0093) |
|
|
184 | (1) |
|
|
|
|
|
Sleep Deprivation Effect on Human Performance: A Meta-Analysis Approach (PSAM-0010) |
|
|
185 | (1) |
|
|
|
Consideration about Psychological Factors in Labour Accidents in Japanese Construction Work (PSAM-0132) |
|
|
186 | (1) |
|
|
|
|
|
|
|
Risk-Informed Decision Making: Decision Analysis |
|
|
|
Stated Preference Analysis Using Probabilistic Inversion (PSAM-0354) |
|
|
187 | (1) |
|
|
|
Decision Making in Two-Dimensional Warranty Planning (PSAM-0186) |
|
|
188 | (1) |
|
|
|
Scenarios: A Multi-Actor Decision-Making Support Tool (PSAM-0347) |
|
|
189 | (1) |
|
|
|
|
|
Modeling Tools and Techniques: Quantitative Risk Management |
|
|
|
Probability Assessment of Offshore Oil Multilateral Wells Construction Process in Brazil (PSAM-0173) |
|
|
190 | (1) |
|
|
Carlos Magno Couto Jacinto |
|
|
|
|
|
|
|
Development of a Structured Database of Safety Methods (PSAM-0140) |
|
|
191 | (1) |
|
|
|
|
Comprehensive Integrated Risk-Informed Safety Management for Commercial Nuclear Power Plants (PSAM-0377) |
|
|
192 | (1) |
|
|
|
Aerospace: Phased Mission Analysis II |
|
|
|
Direct Monte Carlo Simulation for the Reliability Assessment of a Space Propulsion System Phased Mission (PSAM-0067) |
|
|
193 | (1) |
|
|
|
A Dynamic Fault Tree Model for a Propulsion System (PSAM-0188) |
|
|
194 | (1) |
|
|
|
|
|
An Event Tree/Fault Tree Embedded Markov Model Approach for the PSAM-8 Benchmark Problem Concerning a Phased Mission Space Propulsion System (PSAM-0318) |
|
|
195 | (1) |
|
|
|
|
Mission Reliability Evaluation for a Space Propulsion System Phased-Mission Benchmark Problem (PSAM-0425) |
|
|
196 | (1) |
|
|
|
|
|
|
How to Mediate between Health Information Security and Patient Safety (PSAM-0319) |
|
|
197 | (1) |
|
|
|
|
Dependable Requirements Engineering and Change Management of Security-Critical ICT-Driven Systems (PSAM-0101) |
|
|
198 | (1) |
|
|
The Human Factor in Network System Survivability (PSAM-0090) |
|
|
199 | (1) |
|
|
|
|
Fault Tree Representation and Analysis: Human Factors, Cyber Security and Assurance Levels (PSAM-0478) |
|
|
200 | (1) |
|
|
|
|
Modeling Tools and Techniques: Bayesian Methods for Reliability II |
|
|
|
Assessing the Uncertainty Range about the Time to Occurrence of a Key Event Based on Observations (PSAM-0150) |
|
|
201 | (1) |
|
|
Dynamic Bayesian Networks: Modeling Problem (PSAM-0367) |
|
|
202 | (1) |
|
Seyed Mohammad Hadi Hosseini |
|
|
|
Conjugate Priors with Zero Occurrences: Analysts Beware! (PSAM-0435) |
|
|
203 | (1) |
|
|
Nuclear: PSA Applications II |
|
|
|
Discussion of Risk Significance Thresholds for Safety Activity in Nuclear Power Plants (PSAM-0401) |
|
|
204 | (1) |
|
|
|
The Use of the GO-FLOW Methodology to Investigate the Aging Effects in Nuclear Power Plants (PSAM-0113) |
|
|
205 | (1) |
|
|
|
|
Recovery from a Catastrophic Station Blackout (PSAM-0458) |
|
|
206 | (1) |
|
|
|
|
Human Reliability: Treatment of Human Performance Variability |
|
|
|
Orthogonal PSF Taxonomy for Human Reliability Analyses (PSAM-0281) |
|
|
207 | (1) |
|
|
A Technique for Scaling of Decision Error Opportunities Based on Situational Features Identified from Operational Events (PSAM-0389) |
|
|
208 | (1) |
|
|
|
Performance Influencing Factors Modeling in the IDAC Model (PSAM-0403) |
|
|
209 | (1) |
|
|
|
Risk-Informed Decision Making: Risk in Design |
|
|
|
FN-Criteria for Risk Regulation and Probabilistic Design (PSAM-0275) |
|
|
210 | (1) |
|
|
|
|
A Framework to Support Management of Change Based on the Risk Management Information (PSAM-0114) |
|
|
211 | (1) |
|
|
|
|
Modeling Tools and Techniques: Expert Judgment |
|
|
|
A Simplified Expert Elicitation Guideline (PSAM-0089) |
|
|
212 | (1) |
|
|
|
|
|
|
|
A Method for Eliciting Expert Judgment to Estimate Probabilities in a Bayesian Belief Network (PSAM-0244) |
|
|
213 | (1) |
|
|
Performance-Based Expert Judgment Weighting Using Moment Methods (PSAM-0264) |
|
|
214 | (1) |
|
|
|
|
A Methodology for Verification of Nearest Neighbours Avalanche Forecasts Based on Qualitative Expert Assessments (PSAM-0322) |
|
|
215 | (1) |
|
|
|
Aerospace: Meteoroid and Ascent/Orbital Debris |
|
|
|
Development of a Preprocessor for Use with Bumper II to Provide Uncertainty Bounds for Meteoroid/Orbital Debris Risk Estimates0290 (PSAM-0048) |
|
|
216 | (1) |
|
|
|
Risk to Space Shuttle Orbiter Windows from Particles in the Booster Separation Motor Plumes and from Foam Debris (PSAM-0178) |
|
|
217 | (1) |
|
|
|
|
|
Development of the Mars Exploration Rover PRA (PSAM-0027) |
|
|
218 | (1) |
|
|
|
|
|
Finance and Banking: Finance, Banking and Insurance |
|
|
|
Global Financial Analysis (GFA): A Strategic Model of Bankruptcies in the Insurance Industry (PSAM-0017) |
|
|
219 | (1) |
|
|
M. Elisabeth Pate-Cornell |
|
|
``Vulnerability Avoidance'' Investment: A Financial Justification of Expenditures for the Improved Resilience of Enterprises (PSAM-0463) |
|
|
220 | (1) |
|
|
|
Modeling Tools and Techniques: Applying Binary Decision Diagrams |
|
|
|
Can We Trust PRA: Take 3 (PSAM-0370) |
|
|
221 | (1) |
|
|
|
|
An Approach to use BDD during the Fault Tree Editing and Analyzing (PSAM-0142) |
|
|
222 | (1) |
|
|
|
|
Unordered Event Picking for BDD Risk Analysis (PSAM-0060) |
|
|
223 | (1) |
|
|
|
On the Exact Analysis of Non-Coherent Fault Trees: The ASTRA Package (PSAM-0285) |
|
|
224 | (1) |
|
|
|
|
Nuclear: Risk-Informed Technical Specifications |
|
|
|
Risk-Informed Technical Specification Task Force Initiative 7 (PSAM-0015) |
|
|
225 | (1) |
|
|
|
Determining Risk-Balanced Allowed Outage Times for Loviisa Power Plant (PSAM-0394) |
|
|
226 | (1) |
|
|
|
The NRI Approach for Technical Specifications Evaluation (PSAM-0153) |
|
|
227 | (1) |
|
|
Application of Probabilistic Methods for the Evaluation of Deterministic Deviations from Technical Specifications (PSAM-0277) |
|
|
228 | (1) |
|
|
|
|
Activities of the European Network for Inspection and Qualification towards a Harmonized European Approach to RI-ISI (PSAM-0235) |
|
|
229 | (1) |
|
|
|
|
Human Reliability: Performance-Based Investigations of Human Reliability |
|
|
|
Impact of an Ambiguous Secondary Task on Primary Task Performance in Accident Operation (PSAM-0383) |
|
|
230 | (1) |
|
|
|
|
A Research on Task Analysis System for Enroute Air Traffic Control (PSAM-0254) |
|
|
231 | (1) |
|
|
|
|
|
Integrated Safety Assessment of Small Container Ships (PSAM-0234) |
|
|
232 | (1) |
|
|
|
|
|
|
|
Risk-Informed Decision Making: Decision Criteria |
|
|
|
Extension of the Concept of Safety Margin for Risk-Informed Regulatory Decision Making (PSAM-0315) |
|
|
233 | (1) |
|
|
|
|
A Bayesian Approach to Setting Equipment Performance Criteria (PSAM-0438) |
|
|
234 | (1) |
|
|
Modeling Tools and Techniques: Simulation I |
|
|
|
A Comparison of Different Monte Carlo Approaches to RAMS Analysis (PSAM-0355) |
|
|
235 | (1) |
|
|
|
Biased Monte Carlo Simulation Technique for Multi-State Network Unreliability Assessment (PSAM-0070) |
|
|
236 | (1) |
|
|
|
|
Structured Assessment of Bias and Uncertainty in Monte Carlo Simulated Accident Risk (PSAM-0137) |
|
|
237 | (1) |
|
|
|
|
|
|
Trade Studies of Space Launch Architectures using Modular Probabilistic Risk Analysis (PSAM-0210) |
|
|
238 | (1) |
|
|
|
Technology Development Risk Assessment for Space Transportation Systems (PSAM-0211) |
|
|
239 | (1) |
|
|
|
|
Intertwining Risk Insights and Design Decisions (PSAM-0193) |
|
|
240 | (1) |
|
|
|
|
Hydrogen Technology- Ready for Take Off (PSAM-0138) |
|
|
241 | (1) |
|
|
|
|
Transportation: Approach and Methodology |
|
|
|
Study of the Approaches to Improve the Operating Reliability of Tracked Vehicle (PSAM-0098) |
|
|
242 | (1) |
|
|
|
|
Port State Control (PSC) Targetting System with Discriminate Analysis (PSAM-0321) |
|
|
243 | (1) |
|
|
|
|
Evaluation of the Safety in the Rail Vehicles Traffic Using Statistical Methods (PSAM-0469) |
|
|
244 | (1) |
|
|
Modeling Tools and Techniques: External Events |
|
|
|
A Study on the Sensitivity Analysis for Seismic PSA about the Correlation of the Component Damages (PSAM-0118) |
|
|
245 | (1) |
|
|
|
|
|
External Events PSA for Ringhals 2 PWR (PSAM-0159) |
|
|
246 | (1) |
|
|
|
|
Current Limitations of Fire PRA Methodology and Potential Areas for Future Research Activities (PSAM-0352) |
|
|
247 | (1) |
|
|
|
Nuclear: Advanced Reactors |
|
|
|
Screening of Probabilistic Safety Evaluations for Different Advanced Reactor Concepts (PSAM-0034) |
|
|
248 | (1) |
|
|
|
Regulatory Review of Internal and External Hazards of EPR 1600 in Finland (PSAM-0167) |
|
|
249 | (1) |
|
|
|
|
|
|
The Use of Probabilistic Safety Techniques for Evaluating the Advanced CANDU Reactor (ACR) (PSAM-0399) |
|
|
250 | (1) |
|
|
|
|
|
|
|
|
Human Reliability: Challenges for Human Reliability and Complex Systems |
|
|
|
Managing Shortcuts in Engineering Systems and Their Safety Effects: A Management Science Perspective (PSAM-0036) |
|
|
251 | (1) |
|
|
|
Organizational Learning within High Reliability Organizations - Can we afford not to? (PSAM-0072) |
|
|
252 | (1) |
|
|
|
Risk-Informed Decision Making: Technology - Neutral Framework |
|
|
|
International Project BETA on the Probabilistic Safety Assessment of the Kalinin Nuclear Power Plant (PSAM-0375) |
|
|
253 | (1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Design Insights Resulting from the Comparison of U.S. Nuclear Power-Plant Component Birnbaum Importance Measures (PSAM-0091) |
|
|
254 | (1) |
|
|
|
|
|
Modeling Tools and Techniques: Simulation II |
|
|
|
Probabilistic Safety Management of Control Logics According to IEC 61508 (PSAM-0259) |
|
|
255 | (1) |
|
|
EC Tree - A Simple and Powerful Excel Based Event Tree Modeling Tool (PSAM-0465) |
|
|
256 | (1) |
|
|
|
|
|
|
Development of a New Method for Assessing Reliability of a Network (PSAM-0045) |
|
|
257 | (1) |
|
|
Aerospace: Aerospace SR QA |
|
|
|
The Triple-Triplet Conceptual Framework for Integrated Risk Management (PSAM-0278) |
|
|
258 | (1) |
|
|
Importance of Quality Control in Reducing System Risk, A Lesson Learned from the Shuttle and a Recommendation for Future Launch Vehicles (PSAM-0204) |
|
|
259 | (1) |
|
|
|
Transportation: Safety Assessment |
|
|
|
Probabilistic Safety Assessment of Level Crossing System in Japanese Railway (PSAM-0125) |
|
|
260 | (1) |
|
|
|
Safety Assessment of Hydrogen Vehicles (PSAM-0311) |
|
|
261 | (1) |
|
|
|
|
Risk Management of Hazardous Materials Transportation (PSAM-0464) |
|
|
262 | (1) |
|
|
|
|
An Integrated Safety and Reliability Program for Systems of Traction Vehicles (PSAM-0184) |
|
|
263 | (1) |
|
|
|
Modeling Tools and Techniques: PSA Tools II |
|
|
|
Next Generation Probabilistic Risk Assessment (PRA) Tools and Methods (PSAM-0393) |
|
|
264 | (1) |
|
|
|
Real Time Safety Risk Assessment Method Based on the Combination of Event Tree and Fault Tree (PSAM-0018) |
|
|
265 | (1) |
|
|
|
|
|
|
How to Build an Adequate Set of Minimal Cut Sets for PSA Importance Measures Calculation (PSAM-0071) |
|
|
266 | (1) |
|
|
|
|
|
Development of Trend Analysis Methods for Safety Indicators of Nuclear Power Plants (PSAM-0046) |
|
|
267 | (1) |
|
|
|
|
|
|
|
Risk Mitigation for Renewable and Dispersed Generation by the Harmonized Grouping (PSAM-0310) |
|
|
268 | (1) |
|
|
|
Consequence Sensitivity Analyses for a Risk-Informed Review of a Preclosure Safety Analysis (PSAM-0440) |
|
|
269 | (1) |
|
|
|
Organization and Management: Tools and Models for Management and Organizational Factors I |
|
|
|
Use of Visualized Work Processes As An Organizational Tool to Illustrate and Discuss Roles, Responsibility, Collaboration and Risk (PSAM-0169) |
|
|
270 | (1) |
|
|
|
|
A Causal Modeling Framework for Assessing Organizational Factors and Their Impacts on Safety Performance (PSAM-0414) |
|
|
271 | (1) |
|
|
|
Risk-Informed Decision Making: Cost-Benefit |
|
|
|
Integration of Multi-Objective Tradeoff Analysis with Cost-Benefit Analysis in the Allocation of Resources to System Safety (PSAM-0428) |
|
|
272 | (1) |
|
|
|
|
On the Use of Cost-Benefit Analyses and the Cautionary Principle in Safety Management (PSAM-0021) |
|
|
273 | (1) |
|
|
|
Cost-Benefit of Risk Advised Maintenance During the Space Shuttle Major Maintenance Period (PSAM-0042) |
|
|
274 | (1) |
|
|
|
Risk and Economic Estimation of Inspection Policy for Periodically Tested Repairable Components (PSAM-0056) |
|
|
275 | (1) |
|
|
|
Construction, Systems and Structures: Structures, Systems and Modeling |
|
|
|
Risk-Based Deferred Maintenance Prioritization and Scheduling Database System (PSAM-0243) |
|
|
276 | (1) |
|
|
A Methodology to Assess and Mitigate Operational Vulnerabilities Due to Aging Water Utility System Infrastructures (PSAM-0338) |
|
|
277 | (1) |
|
|
|
Probabilistic Risk Analysis for Firedamp Explosion (PSAM-0054) |
|
|
278 | (1) |
|
|
OECD Pipe Failure Data Exchange Project: 1st Term (2002-2005) Results and Insights (PSAM-0059) |
|
|
279 | (1) |
|
|
|
|
Construction, Systems and Structures: PSA Modeling and Methods for Construction, Structures and Systems |
|
|
|
Modeling Critical Infrastructure Reliability with Generalized Linear (Mixed) Models (PSAM-0009) |
|
|
280 | (1) |
|
|
|
Logical Models for Quantification of Occupational Risk: Falling from Mobile Ladders (PSAM-0058) |
|
|
281 | (1) |
|
|
|
|
|
|
|
|
|
|
|
Determination of Reliability Index by Using Ants Colony (PSAM-0284) |
|
|
282 | (1) |
|
|
Modeling Tools and Techniques: Maintenance and Testing Methods I |
|
|
|
An Integrated Simulator for the Maintenance Optimization of Light Water Reactors (PSAM-0427) |
|
|
283 | (1) |
|
|
|
|
|
|
|
|
Optimizing Downhole Safety Valve Test Scheduling Using a Multiobjective Genetic Algorithm (PSAM-0174) |
|
|
284 | (1) |
|
Pauli Adriano de Almada Garcia |
|
|
Carlos Magno Couto Jancito |
|
|
Beatriz de Souza Leite Pires de Lima |
|
|
|
Condition Assessment of Production Separators using Neuro-Fuzzy Tools for Signal Validation and Diagnosis (PSAM-0185) |
|
|
285 | (1) |
|
|
Preventive Maintenance Optimization using Ant Colony Algorithm (PSAM-0182) |
|
|
286 | (1) |
|
|
|
|
|
|
Chemical Process Industry: Chemical and Process Industry Risk |
|
|
|
Quantitative Risk Assessment of the LNG Storage Tank Systems in Taiwan (PSAM-0441) |
|
|
287 | (1) |
|
|
|
|
Integrated Barrier Analysis - A Methodology to Reveal Weaknesses in Offshore Petroleum Activities (PSAM-0003) |
|
|
288 | (1) |
|
|
|
|
|
A Methodology for the Quantitative Assessment of Risk Increase in Process Plants due to Seismic Activity (PSAM-0133) |
|
|
289 | (1) |
|
|
|
|
Probabilistic Safety of an Industrial Facility (PSAM-0231) |
|
|
290 | (1) |
|
|
|
|
Organization and Management: Research in Management and Organizational Factors |
|
|
|
Measuring and Predicting Organizational Learning and Safety Culture (PSAM-0199) |
|
|
291 | (1) |
|
|
|
``This is Not a Computer Game!'' Process Plant Workers' Knowledge to Avoid Unforeseen Incidents (PSAM-0461) |
|
|
292 | (1) |
|
|
Risk Analysis Perspectives as Development Approach in Offshore Oil Production (PSAM-0016) |
|
|
293 | (1) |
|
|
|
|
|
Risk-Informed Decision Making: Complexity and Uncertainty |
|
|
|
A Bayesian Approach to Airframe Reliability Management (PSAM-0183) |
|
|
294 | (1) |
|
|
|
Decision Making Methods Evaluating Uncertainty in Risk Assessment Analysis of Complex Technical Systems (PSAM-0011) |
|
|
295 | (1) |
|
|
|
Using SPARC to Extract Risk Insights from Performance Assessments for HLW Repositories (PSAM-0283) |
|
|
296 | (1) |
|
|
|
Construction, Systems and Structures: PSA for Bridges, Tunnels and Structures |
|
|
|
Probabilistic Interpretation of Robustness for Structural Systems (PSAM-0324) |
|
|
297 | (1) |
|
|
|
Reliability Estimation For Reinforced Concrete Bridges Connected In A Newtork (PSAM-0371) |
|
|
298 | (1) |
|
|
|
Probabilistic Safety Assessment of Civil Engineering Structures with an Emphasis on Bridges (PSAM-0121) |
|
|
299 | (1) |
|
|
|
|
Modeling Tools and Techniques: Quantitative Risk Modeling III |
|
|
|
Study on the PSA Model Considering the Symmetrization of Operational Train Patterns and Loops Affected by Initiating Events (PSAM-0119) |
|
|
300 | (1) |
|
|
|
|
|
|
Calculating Alpha-Factors with the Process-Oriented Simulation Model (PSAM-0055) |
|
|
301 | (1) |
|
|
|
|
Bayesian Probability Papers (PSAM-0272) |
|
|
302 | (1) |
|
|
|
Chemical Process Industry: Incident Case Studies |
|
|
|
On the Analysis of Operational Barriers on Offshore Petroleum Installations (PSAM-0004) |
|
|
303 | (1) |
|
|
Evaluation of the Analytical Bottom-up SIL Proof by Statistical Top-Down Methods (PSAM-0242) |
|
|
304 | (1) |
|
|
|
|
Quantitative Measurement on Safety Instrumented Systems Performance: An Approach for Ensuring a Viability of Another Flare Load Reduction Choice (PSAM-0129) |
|
|
305 | (1) |
|
|
|
|
|
Comparison of the Availability of Trip Systems for Reactors with Exothermal Reactions (PSAM-0361) |
|
|
306 | (1) |
|
|
|
Organization and Management: Tools and Models for Management and Organizational Factors II |
|
|
|
Training on Dependency Defense and CCF Awareness (PSAM-0364) |
|
|
307 | (1) |
|
|
|
|
Learning about NPP Organizations through Root-Cause Analysis using A-CATILaC (PSAM-0400) |
|
|
308 | (1) |
|
|
|
Check-It - Measurement and Improvement of Information Security and Safety Culture (PSAM-0031) |
|
|
309 | (1) |
|
|
|
|
|
Influence of Measures of Risk Prevention and Mitigation on the Frequencies of Rupture of Pipework (PSAM-0392) |
|
|
310 | (1) |
|
|
|
|
|
Risk-Informed Decision Making: Safety Objectives |
|
|
|
The Validity of Safety Goals (PSAM-0162) |
|
|
311 | (1) |
|
|
|
|
|
The Precautionary Principle and Industrial Safety Regulation (PSAM-0276) |
|
|
312 | (1) |
|
|
|
|
A Risk-Benefit-Control Paradigm for Decision-Making (PSAM-0306) |
|
|
313 | (1) |
|
|
Bolted Connections: Safe and Cost-Effective Failure-Probability and Service-Life Prediction and Risk Assessment (PSAM-0135) |
|
|
314 | |
|
|
|