Preface to the One Hundred and Forty-Eighth Edition |
|
vii | |
Special Acknowledgements |
|
xi | |
Acknowledgements |
|
xiii | |
How to use this Book |
|
xxi | |
|
|
|
|
3 | (4) |
|
|
7 | (6) |
|
|
13 | (8) |
|
|
21 | (6) |
|
|
27 | (10) |
|
|
37 | (4) |
|
Building Costs Indices; Tender Price Indices and Location Factors |
|
|
41 | (10) |
|
PART 2 RATES OF WAGES AND LABOUR |
|
|
|
|
51 | (1) |
|
Building and Allied Trades JIC Rates of Pay |
|
|
52 | (1) |
|
Plumbing and Mechanical Engineering Services Rates of Pay |
|
|
53 | (2) |
|
|
55 | (6) |
|
|
61 | (6) |
|
PART 3 APPROXIMATE ESTIMATING |
|
|
|
Building Prices per Functional Unit |
|
|
67 | (4) |
|
Building Prices per Square Metre |
|
|
71 | (10) |
|
|
81 | (54) |
|
|
82 | (7) |
|
|
89 | (3) |
|
|
92 | (4) |
|
Higher Education Refurbishment |
|
|
96 | (3) |
|
|
99 | (3) |
|
Primary Healthcare Centre |
|
|
102 | (5) |
|
Primary Healthcare Centre Fit-out |
|
|
107 | (5) |
|
|
112 | (5) |
|
|
117 | (4) |
|
|
121 | (4) |
|
Apartments - Private Rented Sector |
|
|
125 | (10) |
|
Preliminaries Build-up Example |
|
|
135 | (4) |
|
Approximate Estimating Rates |
|
|
139 | (1) |
|
|
|
|
140 | (4) |
|
|
|
|
144 | (3) |
|
|
147 | (1) |
|
|
147 | (5) |
|
|
152 | (1) |
|
|
153 | (5) |
|
2.6 Windows and External Doors |
|
|
158 | (3) |
|
2.7 Internal Walls and Partitions |
|
|
161 | (3) |
|
|
164 | (1) |
|
|
|
|
165 | (1) |
|
|
166 | (2) |
|
|
168 | (1) |
|
4 Fittings, Furnishings and Equipment |
|
|
|
4.1 Fittings, Furnishings and Equipment |
|
|
169 | (1) |
|
|
|
5.1 Sanitary Installations |
|
|
170 | (1) |
|
|
171 | (1) |
|
5.6 Space Heating and Air Conditioning |
|
|
171 | (1) |
|
|
172 | (1) |
|
5.8 Electrical Installations |
|
|
172 | (1) |
|
|
173 | (1) |
|
5.10 Lift and Conveyor Installations |
|
|
173 | (1) |
|
5.11 Fire and Lightning Protection |
|
|
174 | (1) |
|
5.12 Communication and Security Installations |
|
|
175 | (1) |
|
5.13 Special Installations |
|
|
175 | (1) |
|
5.14 Builder's Work in Connection with Services |
|
|
175 | (1) |
|
|
|
8.2 Roads, Paths, Pavings and Surfacings |
|
|
176 | (2) |
|
8.3 Soft Landscaping, Planting and Irrigation Systems |
|
|
178 | (1) |
|
8.4 Fencings, Railings and Walls |
|
|
178 | (2) |
|
|
180 | (1) |
|
|
180 | (3) |
|
|
183 | (2) |
|
8.8 Ancillary Buildings and Structures |
|
|
185 | (1) |
|
9 Main Contractor's Preliminaries |
|
|
|
9.2 Main Contractor's Preliminaries |
|
|
186 | (5) |
|
PART 4 PRICES FOR MEASURED WORKS |
|
|
|
|
191 | (4) |
|
|
195 | (5) |
|
04 Alterations, repairs and conservation |
|
|
200 | (9) |
|
05 Excavating and filling |
|
|
209 | (10) |
|
|
219 | (4) |
|
|
223 | (5) |
|
09 Diaphragm walls and embedded retaining walls |
|
|
228 | (1) |
|
10 Crib walls, gabions and reinforced earth |
|
|
229 | (1) |
|
11 In situ concrete works |
|
|
230 | (23) |
|
12 Precast/composite concrete |
|
|
253 | (3) |
|
|
256 | (2) |
|
|
258 | (39) |
|
|
297 | (8) |
|
|
305 | (19) |
|
|
324 | (25) |
|
18 Tile and slate roof and wall coverings |
|
|
349 | (14) |
|
|
363 | (5) |
|
20 Proprietary linings and partitions |
|
|
368 | (22) |
|
|
390 | (8) |
|
|
398 | (11) |
|
23 Windows, screens and lights |
|
|
409 | (13) |
|
24 Doors, shutters and hatches |
|
|
422 | (48) |
|
25 Stairs, walkways and balustrades |
|
|
470 | (6) |
|
|
476 | (4) |
|
28 Floor, wall, ceiling and roof finishings |
|
|
480 | (28) |
|
|
508 | (14) |
|
|
522 | (5) |
|
31 Insulation, fire stopping and fire protection |
|
|
527 | (8) |
|
32 Furniture, fittings and equipment |
|
|
535 | (13) |
|
|
548 | (15) |
|
|
563 | (25) |
|
|
588 | (13) |
|
|
601 | (3) |
|
|
604 | (2) |
|
|
606 | (1) |
|
41 Builder's work in connection with services |
|
|
607 | (8) |
|
PART 5 FEES FOR PROFESSIONAL SERVICES |
|
|
|
|
615 | (1) |
|
|
616 | (3) |
|
Consulting Engineers' Fees |
|
|
619 | (1) |
|
The Town and Country Planning Application Fees |
|
|
620 | (1) |
|
The Building (Local Authority Charges) Regulations |
|
|
620 | (3) |
|
PART 6 DAYWORK AND PRIME COST |
|
|
|
Standard Industry Daywork Allowances |
|
|
623 | (24) |
|
PART 7 USEFUL ADDRESSES FOR FURTHER INFORMATION |
|
|
|
Useful Addresses for Further Information |
|
|
647 | (12) |
|
PART 8 TABLES AND MEMORANDA |
|
|
|
|
659 | (4) |
|
|
663 | (4) |
|
|
667 | (1) |
|
Typical Thermal Conductivity of Building Materials |
|
|
668 | (1) |
|
|
669 | (6) |
|
|
675 | (5) |
|
|
680 | (2) |
|
|
682 | (1) |
|
|
683 | (3) |
|
|
686 | (5) |
|
|
691 | (4) |
|
|
695 | (1) |
|
|
696 | (18) |
|
|
714 | (7) |
|
Seeding/Turfing and Planting |
|
|
721 | (3) |
|
|
724 | (5) |
|
|
729 | (7) |
|
Electrical Supply/Power/Lighting Systems |
|
|
736 | (1) |
|
|
737 | (3) |
|
Fractions, Decimals and Millimetre Equivalents |
|
|
740 | (1) |
|
Imperial Standard Wire Gauge (SWG) |
|
|
741 | (1) |
|
Pipes, Water, Storage, Insulation |
|
|
742 | (9) |
Index |
|
751 | |