Preface |
|
vii | |
Special Acknowledgements |
|
ix | |
Acknowledgements |
|
xi | |
|
PART 1 ENGINEERING FEATURES |
|
|
|
Brexit and the UK Construction Sector |
|
|
3 | (2) |
|
Building Energy Management Systems (BEMS) or Building Automation Control System (BACS) |
|
|
5 | (4) |
|
|
9 | (8) |
|
|
17 | (4) |
|
|
21 | (4) |
|
|
25 | (8) |
|
|
33 | (4) |
|
|
37 | (6) |
|
|
43 | (4) |
|
Local Energy Networks: Key to Our Low Carbon Future |
|
|
47 | (4) |
|
|
51 | (6) |
|
Research & Development (R&D) Tax Relief |
|
|
57 | (6) |
|
|
63 | (4) |
|
Smart Building Technology |
|
|
67 | (6) |
|
|
73 | (8) |
|
|
81 | (6) |
|
Special Feature Articles Getting a Clearer Picture of a Building's Energy Performance: the Whole Picture Now Has to `Be Seen' |
|
|
87 | (2) |
|
Businesses Must Take Bigger Strides Towards Net Zero Carbon |
|
|
89 | (2) |
|
The Carbon and Business Cases for Choosing Refurbishment Over New Build |
|
|
91 | (6) |
|
Typical Engineering Details |
|
|
97 | (23) |
|
PART 2 APPROXIMATE ESTIMATING |
|
|
|
|
120 | (1) |
|
|
121 | (2) |
|
RIBA Stage 0/1 Preparation |
|
|
123 | (3) |
|
|
126 | (6) |
|
Approximate Estimating Rates - 5 Services |
|
|
132 | (22) |
|
Building Models - Elemental Cost Summaries |
|
|
154 | (29) |
|
PART 3 MATERIAL COSTS/MEASURED WORK PRICES |
|
|
|
Mechanical Installations Directions |
|
|
183 | (6) |
|
|
189 | (1) |
|
Rainwater Pipework/Gutters |
|
|
189 | (19) |
|
|
208 | (26) |
|
|
234 | (1) |
|
|
234 | (57) |
|
|
291 | (5) |
|
|
296 | (5) |
|
Fuel Oil Storage/Distribution |
|
|
301 | (2) |
|
|
303 | (1) |
|
|
304 | (1) |
|
|
305 | (5) |
|
|
310 | (1) |
|
Fire Extinguishers and Hydrants |
|
|
311 | (2) |
|
38 Mechanical/Cooling/Heating Systems |
|
|
313 | (1) |
|
|
313 | (15) |
|
Packaged Steam Generators |
|
|
328 | (1) |
|
Low Temperature Hot Water Heating |
|
|
329 | (64) |
|
|
393 | (27) |
|
|
420 | (4) |
|
|
424 | (1) |
|
Central Refrigeration Plant |
|
|
425 | (8) |
|
|
433 | (10) |
|
|
443 | (2) |
|
38 Ventilation/Air Conditioning Systems |
|
|
445 | (1) |
|
|
445 | (97) |
|
|
542 | (20) |
|
Low Velocity Air Conditioning |
|
|
562 | (3) |
|
|
565 | (1) |
|
Fan Coil Air Conditioning |
|
|
566 | (3) |
|
Mechanical Ventilation with Heat Recovery (MVHR) Units |
|
|
569 | (4) |
|
PART 4 MATERIAL COSTS/MEASURED WORK PRICES |
|
|
|
Electrical Installations Directions |
|
|
573 | (4) |
|
Electrical Supply/Power/Lighting |
|
|
577 | (1) |
|
Electrical Generation Plant |
|
|
577 | (3) |
|
|
580 | (3) |
|
|
583 | (71) |
|
|
654 | (10) |
|
|
664 | (7) |
|
Uninterruptible Power Supply |
|
|
671 | (2) |
|
Commercial Battery Storage Systems |
|
|
673 | (1) |
|
|
674 | (5) |
|
Communications/Security/Control |
|
|
679 | (1) |
|
|
679 | (2) |
|
|
681 | (2) |
|
|
683 | (3) |
|
|
686 | (6) |
|
|
692 | (1) |
|
Security Detection and Alarm |
|
|
693 | (2) |
|
|
695 | (4) |
|
|
699 | (1) |
|
|
700 | (4) |
|
Central Control/Building Management |
|
|
704 | (2) |
|
|
706 | (3) |
|
|
|
Mechanical Installations Rates of Wages |
|
|
709 | (8) |
|
Electrical Installations Rates of Wages |
|
|
717 | (6) |
|
|
|
Heating and Ventilating Industry |
|
|
723 | (3) |
|
|
726 | (3) |
|
Building Industry Plant Hire Costs |
|
|
729 | (18) |
|
PART 7 TABLES AND MEMORANDA |
|
|
747 | (94) |
Index |
|
841 | |