Update cookies preferences

E-book: Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report

  • Format: 66 pages
  • Pub. Date: 30-Nov-2018
  • Publisher: National Academies Press
  • Language: eng
  • ISBN-13: 9780309485012
Other books in subject:
  • Format - PDF+DRM
  • Price: 4,08 €*
  • * the price is final i.e. no additional discount will apply
  • Add to basket
  • Add to Wishlist
  • This ebook is for personal use only. E-Books are non-refundable.
  • Format: 66 pages
  • Pub. Date: 30-Nov-2018
  • Publisher: National Academies Press
  • Language: eng
  • ISBN-13: 9780309485012
Other books in subject:

DRM restrictions

  • Copying (copy/paste):

    not allowed

  • Printing:

    not allowed

  • Usage:

    Digital Rights Management (DRM)
    The publisher has supplied this book in encrypted form, which means that you need to install free software in order to unlock and read it.  To read this e-book you have to create Adobe ID More info here. Ebook can be read and downloaded up to 6 devices (single user with the same Adobe ID).

    Required software
    To read this ebook on a mobile device (phone or tablet) you'll need to install this free app: PocketBook Reader (iOS / Android)

    To download and read this eBook on a PC or Mac you need Adobe Digital Editions (This is a free app specially developed for eBooks. It's not the same as Adobe Reader, which you probably already have on your computer.)

    You can't read this ebook with Amazon Kindle

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report evaluates the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. This report evaluates DOE-NNSA's plans to ship, receive, and emplace surplus plutonium in WIPP and its understanding of the impacts of these plans on WIPP and WIPP-bound waste streams. This report, the first of two to be issued during this study, provides a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focusing on some of the barriers to their implementation.

Table of Contents



Front Matter Summary 1 Introduction 2 Disposition of Surplus Plutonium by the United States 3 Committee Assessment of DOE-NNSA'S Conceptual Plans for Dilute and Dispose Process References Appendix A: Committee and Staff Biographies Appendix B: Information-Gathering Sessions
Summary 1(5)
1 Introduction
6(2)
2 Disposition of Surplus Plutonium by the United States
8(11)
2.1 Conceptual Plans for Dilute and Dispose
11(5)
2.2 Current Status of DOE-NNSA Dilute and Dispose Planning Effort
16(3)
3 Committee Assessment of Doe-Nnsa's Conceptual Plans for Dilute and Dispose Process
19(18)
3.1 Availability of WIPP for Disposal of 34 MT of Diluted Plutonium
21(6)
3.2 Unclear Strategy for Development of the NEPA Environmental Impact Statement
27(3)
3.3 Dilute and Dispose Is Not an Approved Method for Eliminating Surplus Plutonium in the PMDA
30(3)
3.4 Assessment of Conceptual Plans and Public Outreach
33(2)
3.5 Questions for DOE-NNSA
35(2)
References 37(3)
Appendix A Committee and Staff Biographies 40(8)
Appended B Information-Gathering Sessions 48