Muutke küpsiste eelistusi

E-raamat: NEC4: Effective Preparation and Management of the Construction Programme

(Irwin Mitchell, UK)
  • Formaat: PDF+DRM
  • Ilmumisaeg: 14-Feb-2025
  • Kirjastus: ICE Publishing
  • Keel: eng
  • ISBN-13: 9781836624783
  • Formaat - PDF+DRM
  • Hind: 64,35 €*
  • * hind on lõplik, st. muud allahindlused enam ei rakendu
  • Lisa ostukorvi
  • Lisa soovinimekirja
  • See e-raamat on mõeldud ainult isiklikuks kasutamiseks. E-raamatuid ei saa tagastada.
  • Formaat: PDF+DRM
  • Ilmumisaeg: 14-Feb-2025
  • Kirjastus: ICE Publishing
  • Keel: eng
  • ISBN-13: 9781836624783

DRM piirangud

  • Kopeerimine (copy/paste):

    ei ole lubatud

  • Printimine:

    ei ole lubatud

  • Kasutamine:

    Digitaalõiguste kaitse (DRM)
    Kirjastus on väljastanud selle e-raamatu krüpteeritud kujul, mis tähendab, et selle lugemiseks peate installeerima spetsiaalse tarkvara. Samuti peate looma endale  Adobe ID Rohkem infot siin. E-raamatut saab lugeda 1 kasutaja ning alla laadida kuni 6'de seadmesse (kõik autoriseeritud sama Adobe ID-ga).

    Vajalik tarkvara
    Mobiilsetes seadmetes (telefon või tahvelarvuti) lugemiseks peate installeerima selle tasuta rakenduse: PocketBook Reader (iOS / Android)

    PC või Mac seadmes lugemiseks peate installima Adobe Digital Editionsi (Seeon tasuta rakendus spetsiaalselt e-raamatute lugemiseks. Seda ei tohi segamini ajada Adober Reader'iga, mis tõenäoliselt on juba teie arvutisse installeeritud )

    Seda e-raamatut ei saa lugeda Amazon Kindle's. 

NEC4: Effective Preparation and Management of the Construction Programme explains the critical role of the programme within the NEC4 suite of contracts, providing insight and guidance into NEC4 contract requirements and good practice in the preparation of planning the works and the programme.



The book describes the vital role of the Accepted Programme, both as a contract document, and also as a fundamental tool in contractual procedures, such as its use in assessing changes to planned completion in close to real time, and its use in risk allocation. It includes coverage of key roles of the Client, Contractor and Project Manager in preparing, updating and using the Accepted Programme, and together the chapters provide a sound basis for those preparing and administering the programme in the NEC4 Engineering and Construction Contract (ECC). It is also relevant to users of the NEC4 Professional Services Contract (PSC), the NEC4 Term Service Contract (TSC), and the less onerous programming for the ECC short form.



NEC4: Effective Preparation and Management of the Construction Programme is an essential guide for anyone involved with NEC projects to help them understand the importance of properly managing the contract programme, including professionals involved in preparing an NEC contract, Project Managers who administer the programme, and contractors who must prepare and update them.
Chapter
1. Aims of the book:

Chapter
2. Introduction;

Chapter
3. Function of planning and the programme;

Chapter
4. Preparing the programme;

Chapter
5. Updating the programme;

Chapter
6. The role of the Project Manager;

Chapter
7. Adjusting the Completion Date;

Chapter
8. The wider implications of the NEC4 ECC;

Chapter
9. Keeping the Accepted Programme;

Chapter
10. Project Managers assessments of adjustment to the Completion
Date;

Chapter
11. Implications of losing the Accepted Programme;

Chapter
12. Conclusions and future developments.
Tim Willis MA FCIArb AMICE is a solicitor with Irwin Mitchell in the construction and engineering team and a tutor for ICE training on NEC Contracts.