Muutke küpsiste eelistusi

E-raamat: Spon's Civil Engineering and Highway Works Price Book 2021

Edited by (AECOM, London, UK)
  • Formaat: PDF+DRM
  • Sari: Spon's Price Books
  • Ilmumisaeg: 14-Dec-2020
  • Kirjastus: CRC Press
  • Keel: eng
  • ISBN-13: 9781000205114
  • Formaat - PDF+DRM
  • Hind: 253,50 €*
  • * hind on lõplik, st. muud allahindlused enam ei rakendu
  • Lisa ostukorvi
  • Lisa soovinimekirja
  • See e-raamat on mõeldud ainult isiklikuks kasutamiseks. E-raamatuid ei saa tagastada.
  • Formaat: PDF+DRM
  • Sari: Spon's Price Books
  • Ilmumisaeg: 14-Dec-2020
  • Kirjastus: CRC Press
  • Keel: eng
  • ISBN-13: 9781000205114

DRM piirangud

  • Kopeerimine (copy/paste):

    ei ole lubatud

  • Printimine:

    ei ole lubatud

  • Kasutamine:

    Digitaalõiguste kaitse (DRM)
    Kirjastus on väljastanud selle e-raamatu krüpteeritud kujul, mis tähendab, et selle lugemiseks peate installeerima spetsiaalse tarkvara. Samuti peate looma endale  Adobe ID Rohkem infot siin. E-raamatut saab lugeda 1 kasutaja ning alla laadida kuni 6'de seadmesse (kõik autoriseeritud sama Adobe ID-ga).

    Vajalik tarkvara
    Mobiilsetes seadmetes (telefon või tahvelarvuti) lugemiseks peate installeerima selle tasuta rakenduse: PocketBook Reader (iOS / Android)

    PC või Mac seadmes lugemiseks peate installima Adobe Digital Editionsi (Seeon tasuta rakendus spetsiaalselt e-raamatute lugemiseks. Seda ei tohi segamini ajada Adober Reader'iga, mis tõenäoliselt on juba teie arvutisse installeeritud )

    Seda e-raamatut ei saa lugeda Amazon Kindle's. 

Captures real material, plant and labour costs from the UKs major live rail, civils and highways projects.



SPON'S CIVIL ENGINEERING AND HIGHWAY WORKS PRICE BOOK 2021 from AECOM gives a full breakdown of labour, plant and material elements, with labour rates updated. Cost guidance is given at a number of levels, varying from the more general functional costs to detailed resource costing; and in conformity with CESMM4 and the Highways Method of Measurement, and updated to the CIJC wage agreement.









This 35th edition gives more items on shafts, tunnelling, drainage and water proofing covering some brand new materials and methods. Notes have been added to tunnelling, viaducts, D-walls and piling under the output section. The book partially reflects costs and new ways of working resulting from the Covid-19 pandemic.









Use the access code inside the front cover of the book to get set up with an ebook of this 2021 edition on the VitalSource® Bookshelf platform, available for access and use until the end of December 2021.









along with the standard features you have come to expect from SPON'S CIVIL ENGINEERING AND HIGHWAY WORKS PRICE BOOK:















for budgeting: estimating principles, on-cost advice, method-related charges













for resource costings: labour costs, plant costs, material prices













for rapid cost information: approximate estimates, dayworks, cost indices













for plant and labour allowances: production rates, outputs, man hour constants













for detailed pricing: unit costs with full breakdown, or specialist prices, with advice on item coverage, waste allowances and comparative costs













for incidental advice: tables and formulae, technical information, professional advice





















updates, free of charge, twice a year see inside for registration details. Updates are available online at www.pricebooks.co.uk
Preface to the Thirty-Fifth Edition ix
Acknowledgements xiii
Part 1 General
Purpose and content of the book
3(4)
Outline of the tendering and estimating process
7(8)
Capital allowances
15(8)
Value added tax
23(8)
The aggregates levy
31(6)
Land remediation
37(10)
The landfill tax
47(6)
Part 2 Oncosts And Profit
Risk/opportunity
53(1)
Head office overheads
53(1)
Profit
53(1)
Finance costs - assessment of contract investment
53(2)
Value added tax
55(1)
Tender summary
56(3)
Part 3 Cost Indices And Location Factors
Introduction
59(1)
A constructed cost index
59(1)
The road construction cost index
60(2)
Regional variations
62(3)
Part 4 Resources
Basis of this section
65(2)
Labour costs
67(6)
Plant costs
73(8)
Part 5 Approximate Estimating
Preliminaries and general items
81(16)
Building prices per square metre
97(8)
Approximate estimating rates - General building works
105(47)
1 Substructure
105(1)
1.1 Substructure
105(4)
2 Superstructure
109(1)
2.1 Frame
109(3)
2.2 Upper floors
112(1)
2.3 Roof
112(4)
2.4 Stairs and ramps
116(2)
2.5 External walls
118(5)
2.6 Windows and external doors
123(3)
2.7 Internal walls and partitions
126(2)
2.8 Internal doors
128(1)
3 Internal finishes
129(1)
3.1 Wall finishes
129(2)
3.2 Floor finishes
131(1)
3.3 Ceiling finishes
132(2)
4 Fittings, furnishings and equipment
134(1)
4.1 Fittings, furnishings and equipment
134(1)
5 Services
135(1)
5.1 Sanitary installations
135(1)
5.4 Water installations
136(1)
5.6 Space heating and air conditioning
136(1)
5.7 Ventilation systems
137(1)
5.8 Electrical installations
137(1)
5.9 Fuel installations
138(1)
5.10 Lift and conveyor installations
138(1)
5.11 Fire and lightning protection
139(1)
5.12 Communication and security installations
140(1)
5.13 Special installations
140(1)
5.14 Builder's work in connection with services
140(1)
8 External works
141(1)
8.2 Roads, paths, pavings and surfacings
141(1)
8.3 Soft landscaping, planting and irrigation systems
142(1)
8.4 Fencing, railings and walls
143(1)
8.5 External fixtures
144(1)
8.6 External drainage
145(3)
8.7 External services
148(2)
8.8 Ancillary buildings and structures
150(1)
9 Main contractor's preliminaries
150(1)
9.2 Main contractor's preliminaries
150(2)
Approximate estimating rates - Ancillary building works
152(9)
Water and treatment facilities
152(1)
Earth retention and stabilization
152(1)
Bridgework
153(1)
Tunnelling field costs
154(1)
Highway works
155(2)
Underpasses
157(1)
Access scaffolding
158(1)
Temporary works
158(3)
Part 6 Unit Costs - Civil Engineering Works
Introductory notes
161(2)
Guidance notes
163(2)
Class A General items
165(4)
Class B Ground investigation
169(4)
Class C Geotechnical and other specialist processes
173(7)
Class D Demolition and site clearance
180(3)
Class E Earthworks
183(19)
Class F In situ concrete
202(6)
Class G Concrete ancillaries
208(13)
Class H Precast concrete
221(2)
Class I Pipework - pipes
223(22)
Class J Pipework - fittings and valves
245(1)
Class K Pipework - manholes and pipework ancillaries
246(14)
Class L Pipework - supports and protection, ancillaries to laying and excavation
260(5)
Class M Structural metalwork
265(2)
Class N Miscellaneous metalwork
267(6)
Class O Timber
273(7)
Class P Piles
280(13)
Class Q Piling ancillaries
293(7)
Class R Roads and pavings
300(16)
Class S Rail track
316(8)
Class T Tunnels
324(7)
Class U Brickwork, clockwork and masonry
331(14)
Class V Painting
345(7)
Class W Waterproofing
352(6)
Class X Miscellaneous work
358(5)
Class Y Sewer and water main renovation and ancillary works
363(12)
Part 7 Unit Costs - Highway Works
Introductory notes
375(2)
Guidance notes
377(4)
Series 100: Preliminaries
381(2)
Series 200: Site clearance
383(3)
Series 300: Fencing
386(4)
Series 400: Road restraint systems (vehicle and pedestrian)
390(7)
Series 500: Drainage and service ducts
397(23)
Series 600: Earthworks
420(19)
Series 700: Pavements
439(7)
Series 1100: Kerbs, footways and paved areas
446(8)
Series 1200: Traffic signs and road markings
454(6)
Series 1300: Road lighting columns and brackets, CCTV masts and cantilever masts
460(3)
Series 1400: Electrical work for road lighting and traffic signs
463(3)
Series 1500: Motorway communications
466(20)
Series 1600: Piling and embedded retaining walls468 Series 1700: Structural concrete
486(7)
Series 1800: Steelwork for structures
493(1)
Series 1900: Protection of steelwork against corrosion
494(2)
Series 2000: Waterproofing for structures
496(2)
Series 2100: Bridge bearings
498(2)
Series 2300: Bridge expansion joints and sealing of gaps
500(8)
Series 2400: Brickwork, blockwork and stonework501 Series 2500: Special structures
508(1)
Series 2700: Accommodation works, works for statutory undertakers
509(1)
Series 3000: Landscape and ecology
510(11)
Series 5000: Maintenance painting of steelwork
521(4)
Part 8 Daywork
Introduction
525(1)
Schedules of dayworks carried out incidental to contract work
525(2)
Application of dayworks
527(8)
Part 9 Professional Fees
Consulting engineers' conditions of appointment
535(4)
Quantity surveyors' conditions of appointment
539(4)
Part 10 Outputs
Disposal of excavated materials
543(1)
Breaking out obstructions by hand
544(1)
Loading loose materials and items by hand
545(1)
Placing ready mixed concrete in the works
546(1)
Fixing bar reinforcement
547(1)
Erecting formwork to beams and walls
548(1)
Erecting formwork to slabs
548(1)
Multipliers for formwork
548(1)
Laying and jointing flexible-jointed clayware pipes
549(1)
Precast concrete manholes in sections
550(1)
Tunnelling, diaphragm walls & piling
551(2)
Part 11 Useful Addresses For Further Information
553(10)
Part 12 Tables And Memoranda
563(94)
Index 657
AECOM is one of the worlds largest infrastructure design firms.