List of Figures |
|
xv | |
List of Tables |
|
liv | |
Preface |
|
lvii | |
Disclaimer |
|
lxiii | |
Acknowledgments |
|
lxv | |
Section 1 Modeling Fundamentals |
|
1 | (114) |
|
|
3 | (24) |
|
1.1 Motivation for Modeling |
|
|
3 | (2) |
|
|
5 | (4) |
|
|
5 | (1) |
|
1.2.2 Mathematical Models |
|
|
5 | (4) |
|
|
9 | (2) |
|
1.3.1 Forecasting/Hindcasting Models |
|
|
9 | (2) |
|
1.3.2 Interpretative Models |
|
|
11 | (1) |
|
1.4 Limitations of Models |
|
|
11 | (2) |
|
|
12 | (1) |
|
|
12 | (1) |
|
|
13 | (3) |
|
|
14 | (1) |
|
|
14 | (1) |
|
1.5.3 Presentation of Results |
|
|
15 | (1) |
|
|
15 | (1) |
|
|
16 | (4) |
|
1.6.1 Steps in the Workflow |
|
|
17 | (2) |
|
1.6.2 Verification and Validation |
|
|
19 | (1) |
|
1.7 Common Modeling Errors |
|
|
20 | (2) |
|
|
20 | (1) |
|
|
21 | (1) |
|
|
22 | (5) |
|
Box 1.1 Data-Driven (Black-Box) Models |
|
|
26 | (1) |
|
2 Modeling Purpose and Conceptual Model |
|
|
27 | (42) |
|
|
28 | (1) |
|
2.2 Conceptual Model: Definition and General Features |
|
|
29 | (6) |
|
2.3 Components of a Conceptual Model |
|
|
35 | (24) |
|
|
35 | (2) |
|
2.3.2 Hydrostratigraphy and Hydrogeological Properties |
|
|
37 | (14) |
|
2.3.3 Flow Direction and Sources and Sinks |
|
|
51 | (3) |
|
2.3.4 Groundwater Budget Components |
|
|
54 | (3) |
|
2.3.5 Ancillary Information |
|
|
57 | (2) |
|
2.4 Uncertainty in the Conceptual Model |
|
|
59 | (1) |
|
2.5 Common Modeling Errors |
|
|
59 | (1) |
|
|
60 | (3) |
|
|
63 | (6) |
|
Box 2.1 Geographical Information Systems (GIS) |
|
|
33 | (9) |
|
Box 2.2 Describing the Void Space |
|
|
42 | (27) |
|
3 Basic Mathematics and the Computer Code |
|
|
69 | (46) |
|
|
70 | (1) |
|
3.2 Governing Equation for Groundwater Flow |
|
|
71 | (6) |
|
|
71 | (1) |
|
|
71 | (6) |
|
|
77 | (1) |
|
|
78 | (7) |
|
3.4.1 Analytical Solutions |
|
|
78 | (2) |
|
3.4.2 Analytic Element (AE) Models |
|
|
80 | (5) |
|
|
85 | (11) |
|
|
86 | (3) |
|
|
89 | (2) |
|
3.5.3 Control Volume Finite Differences |
|
|
91 | (4) |
|
|
95 | (1) |
|
|
96 | (6) |
|
|
99 | (1) |
|
|
99 | (1) |
|
|
100 | (1) |
|
|
101 | (1) |
|
|
102 | (5) |
|
|
102 | (3) |
|
|
105 | (1) |
|
3.7.3 Closure Criteria and Solution Convergence |
|
|
105 | (2) |
|
3.8 Common Modeling Errors |
|
|
107 | (1) |
|
|
108 | (3) |
|
|
111 | (6) |
|
Box 3.1 The Hydraulic Conductivity Tensor |
|
|
74 | (5) |
|
Box 3.2 Insights from Analytical Solutions |
|
|
79 | (36) |
Section 2 Designing the Numerical Model |
|
115 | (214) |
|
4 Model Dimensionality and Setting Boundaries |
|
|
117 | (64) |
|
|
118 | (16) |
|
4.1.1 Two-Dimensional Models |
|
|
118 | (15) |
|
4.1.2 Three-Dimensional Models |
|
|
133 | (1) |
|
|
134 | (11) |
|
4.2.1 Physical Boundaries |
|
|
136 | (8) |
|
4.2.2 Hydraulic Boundaries |
|
|
144 | (1) |
|
43 Implementing Boundaries in a Numerical Model |
|
|
145 | (14) |
|
4.3.1 Setting Boundaries in the Grid/Mesh |
|
|
145 | (2) |
|
4.3.2 Specified Head Boundaries |
|
|
147 | (1) |
|
4.3.3 Specified Flow Boundaries |
|
|
148 | (4) |
|
4.3.4 Head-dependent Boundaries |
|
|
152 | (7) |
|
4.4 Extracting Local Boundary Conditions from a Regional Model |
|
|
159 | (3) |
|
4.5 Simulating the Water Table |
|
|
162 | (8) |
|
|
164 | (1) |
|
|
165 | (1) |
|
4.5.3 Variably Saturated Codes |
|
|
166 | (4) |
|
4.6 Common Modeling Errors |
|
|
170 | (1) |
|
|
170 | (6) |
|
|
176 | (5) |
|
Box 4.1 Two-Dimensional or Three-Dimensional-More about the D-F Approximation |
|
|
122 | (3) |
|
|
125 | (3) |
|
Box 4.3 Spreadsheet Solution of a Finite-Difference Profile Model |
|
|
128 | (13) |
|
Box 4.4 The Freshwater-Seawater Interface |
|
|
141 | (12) |
|
Box 4.5 Large Water Budget Errors Arising from an HDB |
|
|
153 | (14) |
|
Box 4.6 What Controls the Water Table? |
|
|
167 | (14) |
|
5 Spatial Discretization and Parameter Assignment |
|
|
181 | (76) |
|
|
182 | (19) |
|
5.1.1 Orienting the Grid/Mesh |
|
|
184 | (1) |
|
5.1.2 Finite-Difference Grid |
|
|
184 | (11) |
|
5.1.3 Finite-Element Mesh |
|
|
195 | (6) |
|
5.2 Horizontal Nodal Spacing |
|
|
201 | (7) |
|
|
202 | (1) |
|
5.2.2 Calibration Targets |
|
|
202 | (1) |
|
5.2.3 Perimeter Boundary Configuration |
|
|
203 | (1) |
|
|
203 | (1) |
|
5.2.5 Faults, Conduits, and Barriers |
|
|
203 | (2) |
|
5.2.6 Internal Sources and Sinks |
|
|
205 | (3) |
|
|
208 | (14) |
|
5.3.1 Vertical Discretization |
|
|
209 | (5) |
|
|
214 | (1) |
|
|
215 | (1) |
|
5.3.4 Pinchouts and Faults |
|
|
216 | (1) |
|
5.3.5 Dipping Hydrogeologic Units |
|
|
217 | (5) |
|
|
222 | (14) |
|
5.4.1 Material Property Parameters |
|
|
223 | (7) |
|
5.4.2 Hydrologic Parameters |
|
|
230 | (6) |
|
|
236 | (5) |
|
|
236 | (1) |
|
5.5.2 Assigning Storage Parameters to Layers |
|
|
237 | (1) |
|
5.5.3 Populating the Grid or Mesh |
|
|
237 | (4) |
|
5.6 Parameter Uncertainty |
|
|
241 | (2) |
|
5.7 Common Modeling Errors |
|
|
243 | (1) |
|
|
244 | (5) |
|
|
249 | (8) |
|
Box 5.1 Numerical Error Inherent to Irregular FD Grids |
|
|
190 | (10) |
|
Box 5.2 Vertical Anisotropy and the Transformed Section |
|
|
200 | (11) |
|
Box 5.3 Upscaling Hydraulic Conductivity: Layered Heterogeneity and Vertical Anisotropy |
|
|
211 | (21) |
|
Box 5.4 When Infiltration becomes Recharge |
|
|
232 | (25) |
|
6 More on Sources and Sinks |
|
|
257 | (46) |
|
|
258 | (1) |
|
6.2 Pumping and Injection Wells |
|
|
259 | (11) |
|
|
262 | (1) |
|
6.2.2 FE Well Nodes and Multinode Wells |
|
|
262 | (2) |
|
6.2.3 Multinode Wells in FD Models |
|
|
264 | (6) |
|
6.3 Areally Distributed Sources and Sinks |
|
|
270 | (2) |
|
|
272 | (1) |
|
|
273 | (6) |
|
|
279 | (4) |
|
|
283 | (8) |
|
6.8 Common Modeling Errors |
|
|
291 | (1) |
|
|
292 | (4) |
|
|
296 | (7) |
|
Box 6.1 Guidelines for Nodal Spacing around a Well Node |
|
|
267 | (18) |
|
Box 6.2 Watershed Modeling |
|
|
285 | (4) |
|
Box 6.3 Surface Water Modeling |
|
|
289 | (14) |
|
7 Steady-State and Transient Simulations |
|
|
303 | (26) |
|
7.1 Steady-State Simulations |
|
|
303 | (4) |
|
|
304 | (1) |
|
7.1.2 Boundary Conditions |
|
|
304 | (1) |
|
7.1.3 Characterizing Steady-State Conditions |
|
|
305 | (2) |
|
7.2 Steady State or Transient? |
|
|
307 | (3) |
|
7.3 Transient Simulations |
|
|
310 | (2) |
|
|
312 | (2) |
|
7.5 Perimeter Boundary Conditions for Transient Simulations |
|
|
314 | (2) |
|
|
316 | (4) |
|
7.6.1 Time Steps and Stress Periods |
|
|
316 | (2) |
|
7.6.2 Selecting the Time Step |
|
|
318 | (2) |
|
7.7 Characterizing Transient Conditions |
|
|
320 | (4) |
|
7.8 Common Modeling Errors |
|
|
324 | (1) |
|
|
324 | (2) |
|
|
326 | (3) |
Section 3 Particle Tracking, Calibration, Forecasting, and Uncertainty Analysis |
|
329 | (164) |
|
|
331 | (44) |
|
|
331 | (7) |
|
8.2 Velocity Interpolation |
|
|
338 | (8) |
|
8.2.1 Effect of Spatial Discretization |
|
|
338 | (2) |
|
8.2.2 Effect of Temporal Discretization |
|
|
340 | (1) |
|
8.2.3 Interpolation Methods |
|
|
341 | (5) |
|
|
346 | (3) |
|
8.3.1 Semianalytical Method |
|
|
347 | (1) |
|
|
348 | (1) |
|
|
349 | (2) |
|
|
351 | (13) |
|
8.5.1 Flow System Analysis |
|
|
357 | (1) |
|
8.5.2 Capture Zones and Contributing Areas |
|
|
358 | (5) |
|
8.5.3 Advective Transport of Contaminants |
|
|
363 | (1) |
|
8.6 Particle Tracking Codes |
|
|
364 | (1) |
|
8.7 Common Errors in Particle Tracking |
|
|
365 | (1) |
|
|
366 | (4) |
|
|
370 | (5) |
|
Box 8.1 Effective Porosity |
|
|
332 | (3) |
|
|
335 | (25) |
|
Box 8.3 More on Capture Zones and Contributing Areas |
|
|
360 | (15) |
|
9 Model Calibration: Assessing Performance |
|
|
375 | (68) |
|
|
376 | (2) |
|
9.2 Limitations of History Matching |
|
|
378 | (2) |
|
|
380 | (5) |
|
|
381 | (1) |
|
|
382 | (2) |
|
|
384 | (1) |
|
9.4 Manual History Matching |
|
|
385 | (11) |
|
9.4.1 Comparing Model Output to Observations |
|
|
385 | (8) |
|
9.4.2 Choosing the Parameters to Adjust |
|
|
393 | (1) |
|
9.4.3 Manual Trial-and-Error History Matching |
|
|
394 | (1) |
|
9.4.4 Limitations of a Manual Approach |
|
|
395 | (1) |
|
9.5 Parameter Estimation: Automated Trial-and-Error History Matching |
|
|
396 | (15) |
|
9.5.1 Weighting the Targets |
|
|
400 | (2) |
|
|
402 | (8) |
|
9.5.3 Statistical Analysis |
|
|
410 | (1) |
|
9.6 Highly Parameterized Model Calibration with Regularized Inversion |
|
|
411 | (15) |
|
9.6.1 Increasing the Number of Calibration Parameters |
|
|
412 | (2) |
|
9.6.2 Stabilizing Parameter Estimation |
|
|
414 | (10) |
|
9.6.3 Speeding the Parameter Estimation Process |
|
|
424 | (2) |
|
9.7 A Workflow for Calibration and Model Performance Evaluation |
|
|
426 | (5) |
|
9.8 Common Modeling Errors |
|
|
431 | (1) |
|
|
432 | (4) |
|
|
436 | (7) |
|
Box 9.1 Historical Context for Parameter Estimation |
|
|
397 | (11) |
|
Box 9.2 Tips for Running a Parameter Estimation Code |
|
|
408 | (8) |
|
Box 9.3 Tips for Effective Pilot Point Parameterization |
|
|
416 | (5) |
|
Box 9.4 A "Singularly Valuable Decomposition"-Benefits for Groundwater Modeling |
|
|
421 | (6) |
|
Box 9.5 Code/Model Verification and Model Validation |
|
|
427 | (3) |
|
Box 9.6 Additional Parameter Estimation Tools |
|
|
430 | (13) |
|
10 Forecasting and Uncertainty Analysis |
|
|
443 | (50) |
|
|
443 | (4) |
|
10.2 Characterizing Uncertainty |
|
|
447 | (6) |
|
10.3 Addressing Uncertainty |
|
|
453 | (5) |
|
10.4 Basic Uncertainty Analysis |
|
|
458 | (11) |
|
|
458 | (2) |
|
10.4.2 Linear Uncertainty Analysis |
|
|
460 | (9) |
|
10.5 Advanced Uncertainty Analysis |
|
|
469 | (11) |
|
10.5.1 Analysis Using One Conceptualization |
|
|
469 | (8) |
|
10.5.2 Analysis Using Multiple Conceptualizations |
|
|
477 | (3) |
|
10.6 Reporting Forecast Uncertainty |
|
|
480 | (1) |
|
10.7 Evaluating Forecasts: Postaudits |
|
|
481 | (2) |
|
10.8 Common Modeling Errors |
|
|
483 | (1) |
|
|
483 | (2) |
|
|
485 | (10) |
|
Box 10.1 Historical Overview of Uncertainty Analysis in Groundwater Modeling |
|
|
446 | (9) |
|
Box 10.2 Travel Time in Heterogeneous Aquifers: Impossible to Forecast Accurately? |
|
|
455 | (13) |
|
Box 10.3 Cost-Benefit Analyses of Future Data Collection |
|
|
468 | (4) |
|
Box 10.4 Using Monte Carlo Methods to Represent Forecast Uncertainty |
|
|
472 | (21) |
Section 4 The Modeling Report and Advanced Topics |
|
493 | (42) |
|
11 The Modeling Report, Archive, and Review |
|
|
495 | (20) |
|
|
495 | (3) |
|
|
498 | (11) |
|
|
498 | (1) |
|
11.2.2 Executive Summary and Abstract |
|
|
499 | (1) |
|
|
500 | (1) |
|
11.2.4 Hydrogeologic Setting and Conceptual Model |
|
|
500 | (2) |
|
|
502 | (4) |
|
11.2.6 Forecasting Simulations and Uncertainty Analysis |
|
|
506 | (1) |
|
|
507 | (1) |
|
11.2.8 Model Assumptions, Simplifications, and Limitations |
|
|
508 | (1) |
|
11.2.9 Summary and Conclusions |
|
|
508 | (1) |
|
|
508 | (1) |
|
|
509 | (1) |
|
|
509 | (1) |
|
11.4 Reviewing the Modeling Report |
|
|
510 | (3) |
|
11.5 Common Errors in Report/Archive Preparation and Review |
|
|
513 | (1) |
|
|
513 | (1) |
|
|
514 | (1) |
|
12 Beyond Basic Modeling Concepts |
|
|
515 | (20) |
|
|
515 | (3) |
|
12.2 Complex Groundwater Flow Processes |
|
|
518 | (4) |
|
12.2.1 Flow through Fractures and Conduits |
|
|
518 | (1) |
|
12.2.2 Aquifer Compaction |
|
|
518 | (1) |
|
12.2.3 Variably Saturated Flow |
|
|
519 | (1) |
|
12.2.4 Variable Density Flow |
|
|
520 | (1) |
|
|
521 | (1) |
|
12.2.6 Linked and Coupled Models |
|
|
521 | (1) |
|
|
522 | (1) |
|
12.4 Surface Water Processes |
|
|
523 | (1) |
|
12.5 Stochastic Groundwater Modeling |
|
|
524 | (1) |
|
12.6 Decision-Support and Optimization |
|
|
525 | (1) |
|
|
526 | (1) |
|
|
527 | (8) |
Index |
|
535 | |