Preface |
|
vii | |
Acknowledgements |
|
x | |
Contract abbreviations |
|
xi | |
Part I |
|
1 | (216) |
|
|
3 | (17) |
|
1.1 Structure of the book |
|
|
3 | (1) |
|
|
3 | (5) |
|
|
8 | (3) |
|
1.4 Architect's and contract administrator's powers and liability to contractor |
|
|
11 | (5) |
|
1.5 Quantity surveyor's powers |
|
|
16 | (4) |
|
|
20 | (37) |
|
|
20 | (2) |
|
|
22 | (4) |
|
2.3 Extension of time clauses in contracts |
|
|
26 | (6) |
|
|
32 | (8) |
|
|
40 | (7) |
|
|
47 | (4) |
|
2.7 The SCL extension of time Protocol |
|
|
51 | (6) |
|
|
57 | (38) |
|
3.1 The meaning and purpose of liquidated damages |
|
|
57 | (1) |
|
3.2 Liquidated damages or penalty |
|
|
58 | (7) |
|
3.3 Liquidated damages as limitation of liability |
|
|
65 | (1) |
|
3.4 Sums greater than a genuine pre-estimate |
|
|
66 | (1) |
|
3.5 Liquidated damages as an exhaustive remedy |
|
|
67 | (5) |
|
|
72 | (2) |
|
3.7 Liquidated damages in relation to loss |
|
|
74 | (1) |
|
3.8 Where there is no breach of contract |
|
|
75 | (2) |
|
3.9 Calculation of liquidated damages |
|
|
77 | (1) |
|
3.10 Where there is partial possession |
|
|
78 | (2) |
|
3.11 Maximum recovery if sum is a penalty |
|
|
80 | (2) |
|
3.12 Maximum recovery if liquidated damages do not apply |
|
|
82 | (2) |
|
3.13 Defences to liquidated damages in building contracts |
|
|
84 | (9) |
|
|
93 | (2) |
|
4 Basis for common law claims |
|
|
95 | (22) |
|
|
95 | (2) |
|
|
97 | (6) |
|
4.3 Variation of contract |
|
|
103 | (1) |
|
4.4 Omission of work to give it to others |
|
|
104 | (3) |
|
|
107 | (2) |
|
|
109 | (4) |
|
|
113 | (4) |
|
5 Direct loss and/or expense |
|
|
117 | (6) |
|
|
117 | (1) |
|
|
118 | (2) |
|
5.3 Exclusion of consequential loss |
|
|
120 | (3) |
|
|
123 | (17) |
|
|
123 | (1) |
|
|
124 | (1) |
|
|
125 | (1) |
|
|
125 | (2) |
|
|
127 | (1) |
|
|
128 | (7) |
|
|
135 | (5) |
|
7 Potential heads of daim |
|
|
140 | (42) |
|
7.1 Foreshortened programme |
|
|
140 | (3) |
|
7.2 The 'knock-on' effect |
|
|
143 | (4) |
|
7.3 The more common heads of loss |
|
|
147 | (33) |
|
|
180 | (2) |
|
|
182 | (10) |
|
|
182 | (2) |
|
|
184 | (5) |
|
|
189 | (3) |
|
|
192 | (9) |
|
9.1 Basic principles of global claims |
|
|
192 | (2) |
|
9.2 Unacceptable global claims |
|
|
194 | (2) |
|
|
196 | (5) |
|
10 Preparation and substantiation of claims |
|
|
201 | (16) |
|
|
201 | (5) |
|
10.2 Types of evidence required to support a claim |
|
|
206 | (7) |
|
|
213 | (4) |
Part II |
|
217 | (150) |
|
11 Extension of time under JCT standard form contracts |
|
|
219 | (49) |
|
11.1 Standard Building Contract (SBC) |
|
|
219 | (29) |
|
11.2 Intermediate Building Contract (IC and ICD) |
|
|
248 | (3) |
|
11.3 Minor Works Building Contract (MW and MWD) |
|
|
251 | (3) |
|
11.4 Design and Build Contract (DB) |
|
|
254 | (2) |
|
11.5 Prime Cost Building Contract (PCC) |
|
|
256 | (1) |
|
11.6 Management Building Contract (MC) |
|
|
257 | (2) |
|
11.7 Construction Management Trade Contract (CM/TC) |
|
|
259 | (1) |
|
11.8 Major Project Construction Contract (MP) |
|
|
260 | (2) |
|
11.9 Measured Term Contract (MTC) |
|
|
262 | (2) |
|
11.10 Constructing Excellence Contract (CE) |
|
|
264 | (4) |
|
12 Liquidated damages under JCT standard form contracts |
|
|
268 | (10) |
|
12.1 Standard Building Contract (SBC) |
|
|
268 | (5) |
|
12.2 Intermediate Building Contract (IC and ICD) |
|
|
273 | (1) |
|
12.3 Minor Works Building Contract (MW and MWD) |
|
|
273 | (1) |
|
12.4 Design and Build Contract (DB) |
|
|
274 | (1) |
|
12.5 Prime Cost Building Contract (PCC) |
|
|
275 | (1) |
|
12.6 Management Building Contract (MC) |
|
|
275 | (1) |
|
12.7 Construction Management Trade Contract (CM/TC) |
|
|
275 | (1) |
|
12.8 Major Project Construction Contract (MP) |
|
|
276 | (1) |
|
12.9 Measured Term Contract (MTC) |
|
|
276 | (1) |
|
12.10 Constructing Excellence Contract (CE) |
|
|
277 | (1) |
|
13 Loss and/or expense under JCT standard form contracts |
|
|
278 | (41) |
|
13.1 Standard Building Contract (SBC) |
|
|
278 | (27) |
|
13.2 Intermediate Building Contract (IC and ICD) |
|
|
305 | (4) |
|
13.3 Minor Works Building Contract (MW and MWD) |
|
|
309 | (2) |
|
13.4 Design and Build Contract (DB) |
|
|
311 | (4) |
|
13.5 Prime Cost Building Contract (PCC) |
|
|
315 | (1) |
|
13.6 Management Building Contract (MC) |
|
|
316 | (1) |
|
13.7 Construction Management Trade Contract (CM/TC) |
|
|
316 | (1) |
|
13.8 Major Project Construction Contract (MP) |
|
|
316 | (2) |
|
13.9 Measured Term Contract (MTC) |
|
|
318 | (1) |
|
13.10 Constructing Excellence Contract (CE) |
|
|
318 | (1) |
|
|
319 | (48) |
|
|
319 | (1) |
|
|
320 | (1) |
|
|
321 | (3) |
|
14.4 Functions of the architect and the quantity surveyor |
|
|
324 | (1) |
|
14.5 JCT Standard Building Contract (SBC) |
|
|
325 | (20) |
|
14.6 JCT Intermediate Building Contract (IC and ICD) |
|
|
345 | (5) |
|
14.7 JCT Minor Works Building Contract (MW and MWD) |
|
|
350 | (2) |
|
14.8 JCT Design and Build Contract (DB) |
|
|
352 | (8) |
|
14.9 JCT Prime Cost Building Contract (PCC) |
|
|
360 | (1) |
|
14.10 JCT Management Building Contract (MC) |
|
|
361 | (1) |
|
14.11 JCT Construction Management Trade Contract (CM/TC) |
|
|
361 | (1) |
|
14.12 JCT Major Project Construction Contract (MP) |
|
|
362 | (2) |
|
14.13 JCT Measured Term Contract (MTC) |
|
|
364 | (2) |
|
14.14 JCT Constructing Excellence Contract (CE) |
|
|
366 | (1) |
Part III |
|
367 | (106) |
|
15 Claims Under The General Conditions of Government Contracts for Building and Civil Engineering Works (GC/Works/1(1998)) |
|
|
369 | (16) |
|
|
369 | (1) |
|
15.2 Extension of time and liquidated damages |
|
|
369 | (8) |
|
15.3 Prolongation and disruption |
|
|
377 | (4) |
|
15.4 Valuation of instructions |
|
|
381 | (4) |
|
16 Claims under the ACA Form of Building Agreement (ACA 3) |
|
|
385 | (22) |
|
|
385 | (1) |
|
16.2 Extension of time and liquidated damages |
|
|
386 | (9) |
|
16.3 Prolongation and disruption |
|
|
395 | (7) |
|
16.4 Valuation of instructions |
|
|
402 | (5) |
|
17 Claims under the ACA Standard Form of Contract for Project Partnering (PPC2000) |
|
|
407 | (11) |
|
|
407 | (1) |
|
17.2 Extension of time and damages |
|
|
408 | (5) |
|
|
413 | (2) |
|
|
415 | (3) |
|
18 Claims under NEC 3 Engineering and Construction Contract (NEC 3) |
|
|
418 | (28) |
|
|
418 | (2) |
|
|
420 | (24) |
|
|
444 | (2) |
|
|
446 | (27) |
|
|
446 | (1) |
|
19.2 JCT Standard Building Sub-Contract Conditions (SBCSub/C) |
|
|
446 | (11) |
|
19.3 JOT Standard Building Sub-Contract with Sub-Contractor's Design Conditions (SBCSub/D/C) |
|
|
457 | (1) |
|
19.4 JCT Intermediate Named Sub-Contract Conditions (ICSubNAM/SC) |
|
|
458 | (1) |
|
19.5 JCT Intermediate Sub-Contract Conditions (ICSub/C) |
|
|
459 | (1) |
|
19.6 JCT Intermediate Sub-Contract with Sub-Contractor's Design Conditions (ICSub/D/C) |
|
|
460 | (1) |
|
19.7 JOT Design and Build Sub-Contract Conditions (DBSub/C) |
|
|
460 | (2) |
|
19.8 JOT Management Works Contract Conditions (MCWC/C) |
|
|
462 | (3) |
|
19.9 ACA Form of Sub-Contract (ACA/SC) |
|
|
465 | (8) |
Appendix |
|
473 | (2) |
Example of contractor's claim for reimbursement of direct loss and/or expense under SBC with quantities clauses 4.23-4.26, architect's and quantity surveyor's assessment with commentary |
|
475 | (23) |
Table of cases |
|
498 | (14) |
Table of standard form contract clauses |
|
512 | (11) |
Index |
|
523 | |