Preface to Second Edition |
|
xxi | |
Preface to First Edition |
|
xxiii | |
Glossary of Latin terms |
|
xxv | |
Abbreviations |
|
xxvii | |
|
Style of JCT 05 Standard Building Contract, contract execution and related problems |
|
|
1 | (71) |
|
Standard form contracts generally |
|
|
1 | (1) |
|
The Joint Contracts Tribunal Limited |
|
|
2 | (2) |
|
JCT 05: Use, style and criticism |
|
|
4 | (6) |
|
|
4 | (2) |
|
|
6 | (1) |
|
|
7 | (2) |
|
Scope of this book-JCT 05 Standard Building Contract, With Quantities |
|
|
9 | (1) |
|
Documents forming the Contract |
|
|
10 | (11) |
|
|
10 | (1) |
|
|
10 | (1) |
|
Articles of Agreement-Recitals, Articles, Contract Particulars, Attestation |
|
|
10 | (5) |
|
|
15 | (1) |
|
|
15 | (2) |
|
|
17 | (1) |
|
|
17 | (2) |
|
Documments related to Contractor's Designed Portion (where applicable) |
|
|
19 | (1) |
|
|
19 | (1) |
|
|
20 | (1) |
|
|
20 | (1) |
|
Other documents: Standard Method of Measurement |
|
|
20 | (1) |
|
Other documents: Adjudication Agreements |
|
|
21 | (1) |
|
Other documents: Model Arbitration Rules |
|
|
21 | (1) |
|
Other documents: Sundry descriptive documents |
|
|
21 | (1) |
|
Preparing the Contract Documents |
|
|
21 | (29) |
|
|
21 | (1) |
|
Agreement, Contract Particulars, Schedules |
|
|
22 | (1) |
|
|
22 | (1) |
|
|
22 | (2) |
|
|
24 | (1) |
|
Contract Particulars-Part 1: General |
|
|
25 | (9) |
|
Contract Particulars-Part 2: Third Party Rights and Collateral Warranties |
|
|
34 | (3) |
|
|
37 | (2) |
|
|
39 | (1) |
|
Drawings and Bills of Quantities |
|
|
39 | (1) |
|
|
39 | (1) |
|
|
39 | (1) |
|
|
40 | (1) |
|
Amending the Standard Contract Form |
|
|
41 | (1) |
|
|
41 | (1) |
|
Amendment by introduction in the Bills and other documents |
|
|
42 | (1) |
|
Amendments to the printed standard form |
|
|
43 | (1) |
|
Amendments to the Conditions in breach of the `Construction Act'1996 |
|
|
44 | (4) |
|
Amendments and additions in breach of the Unfair Contract Terms Act 1977 |
|
|
48 | (1) |
|
Amendments to alter periods under the Limitation Act 1980 |
|
|
49 | (1) |
|
Custody of Contract Documents |
|
|
50 | (1) |
|
|
50 | (4) |
|
Two versions of a drawing revision, the wrong version of which is signed |
|
|
50 | (1) |
|
Contract Drawings listed do not correspond with Drawings signed |
|
|
50 | (1) |
|
Failure to complete the Contract Documents |
|
|
51 | (1) |
|
Failure to complete the formalities |
|
|
52 | (1) |
|
|
53 | (1) |
|
Forming a contract and the `Battle of Forms' |
|
|
54 | (4) |
|
Letters of intent and the right to payment |
|
|
58 | (14) |
|
Letters of intent: meaning and effect |
|
|
58 | (1) |
|
|
58 | (3) |
|
Letters of intent and standard form contracts |
|
|
61 | (3) |
|
Letters of intent: right to payment |
|
|
64 | (1) |
|
Right to payment: introduction |
|
|
64 | (1) |
|
Quasi-contract and restitution |
|
|
65 | (1) |
|
|
66 | (6) |
|
Participants in the project and their roles under the Contract |
|
|
72 | (46) |
|
|
72 | (5) |
|
Express contractual duties |
|
|
72 | (2) |
|
Implied contractual duties |
|
|
74 | (1) |
|
Duty not to interfere with the discretion of the Architect or Quantity Surveyor |
|
|
75 | (1) |
|
|
75 | (1) |
|
The Employer as client under the Site Waste Management Plans Regulations |
|
|
76 | (1) |
|
The Employer's Representative |
|
|
77 | (1) |
|
|
78 | (18) |
|
Materials and workmanship |
|
|
78 | (1) |
|
|
78 | (2) |
|
|
80 | (3) |
|
Substitution of materials required under the Contract |
|
|
83 | (1) |
|
The Contractor's duty to give notices |
|
|
83 | (2) |
|
The Contractor's design responsibility |
|
|
85 | (1) |
|
The Contractor's CDP obligations |
|
|
86 | (1) |
|
The Contractor's duty to warn |
|
|
86 | (2) |
|
Duty to comply with Architect's Instructions (AIs) |
|
|
88 | (1) |
|
Duties relating to the Contractor's master programme |
|
|
88 | (1) |
|
The Society of Construction Law's Protocol |
|
|
89 | (1) |
|
The contractual status of the Contractor's programmes |
|
|
90 | (2) |
|
|
92 | (1) |
|
Divergence in contractual requirements |
|
|
93 | (1) |
|
Unauthorized variations to comply with Statutory Requirements |
|
|
94 | (1) |
|
Duty to indemnify the Employer |
|
|
94 | (1) |
|
|
95 | (1) |
|
Duties with respect to assignment and sub-contracting |
|
|
95 | (1) |
|
Obligations in respect of other contractors of the employer |
|
|
95 | (1) |
|
The principal contractor under the Site Waste Management Plan Regulations |
|
|
96 | (1) |
|
|
96 | (17) |
|
Duty to provide drawings, instructions and other information |
|
|
99 | (1) |
|
Items in the Information Release Schedule |
|
|
99 | (1) |
|
Information not listed in the Information Release Schedule |
|
|
99 | (2) |
|
Information from other designers |
|
|
101 | (1) |
|
Claims for delayed drawings and other information |
|
|
102 | (1) |
|
|
102 | (1) |
|
Evidence of Architect's satisfaction and appropriate materials and goods |
|
|
102 | (1) |
|
|
103 | (1) |
|
Removal of non-conforming work and materials |
|
|
103 | (1) |
|
Acceptance of non-conforming work |
|
|
104 | (1) |
|
Variations and other instructions |
|
|
105 | (1) |
|
Defective work and Interim Certificates |
|
|
106 | (1) |
|
|
107 | (1) |
|
Withholding the Practical Completion Certificate |
|
|
107 | (1) |
|
Construction Skills Certification Scheme |
|
|
107 | (1) |
|
The extent of the Architect's duty to supervise/inspect |
|
|
107 | (2) |
|
|
109 | (1) |
|
Duty to report on failings of other members of the design team |
|
|
110 | (1) |
|
Standard of skill and care expected of the Architect |
|
|
110 | (1) |
|
Liability of the Architect to the employer |
|
|
111 | (1) |
|
Liability of the Architect to the Contractor and other third parties |
|
|
112 | (1) |
|
|
113 | (1) |
|
|
113 | (1) |
|
The Person-in-Charge (PIC) |
|
|
114 | (1) |
|
|
115 | (2) |
|
Suppliers and sub-contractors |
|
|
117 | (1) |
|
|
117 | (1) |
|
|
118 | (23) |
|
|
120 | (2) |
|
|
120 | (1) |
|
Possession of site under the JCT 05 |
|
|
121 | (1) |
|
|
122 | (1) |
|
Practical Completion Certificate |
|
|
123 | (2) |
|
Meaning of `practical completion' |
|
|
123 | (1) |
|
Effect of the Practical Completion Certificate |
|
|
124 | (1) |
|
Non-Completion Certificate |
|
|
125 | (1) |
|
|
126 | (3) |
|
Liability for defects that appear during the Rectification Period |
|
|
127 | (1) |
|
Defects after the Rectification Period |
|
|
127 | (1) |
|
Consequential loss from defects |
|
|
128 | (1) |
|
Variations after practical completion? |
|
|
129 | (1) |
|
Certificate of Making Good |
|
|
129 | (1) |
|
Final adjustment of the Contract Sum |
|
|
130 | (1) |
|
|
130 | (4) |
|
Conditions precedent to a valid Final Certificate |
|
|
131 | (2) |
|
Timetable for issue of the Final Certificate |
|
|
133 | (1) |
|
Payment on the Certificate |
|
|
133 | (1) |
|
Effect of Final Certificate |
|
|
134 | (4) |
|
|
134 | (1) |
|
Adjustment of the Contract Sum and claims |
|
|
135 | (1) |
|
|
135 | (2) |
|
Adjudication, arbitration or other proceedings |
|
|
137 | (1) |
|
|
138 | (1) |
|
|
138 | (1) |
|
Early use/occupation by the Employer |
|
|
139 | (2) |
|
|
141 | (19) |
|
|
141 | (1) |
|
Contractor's Designed Portion Works (CDP Works) |
|
|
141 | (13) |
|
|
141 | (1) |
|
CDP Documents: Employer's Requirements |
|
|
142 | (3) |
|
CDP Documents: Contractor's Proposals |
|
|
145 | (1) |
|
|
146 | (1) |
|
Employer's response to Contractor's Proposals |
|
|
147 | (1) |
|
Execution: Contractor's Design Submission Procedure (Schedule 1) |
|
|
147 | (7) |
|
Execution: Integration into Architect's design |
|
|
154 | (1) |
|
Execution: Divergence and discrepancies |
|
|
154 | (1) |
|
|
154 | (1) |
|
Specification by performance |
|
|
154 | (1) |
|
Liability for design and installation |
|
|
155 | (5) |
|
Common law standard: fitness for purpose |
|
|
156 | (1) |
|
Reasonable skill and care |
|
|
156 | (1) |
|
JCT 05 - Express obligation |
|
|
157 | (1) |
|
JCT 05 - Liability for Employer's design, and obligation to check |
|
|
158 | (2) |
|
|
160 | (7) |
|
Power to issue instructions, confirmations, etc. |
|
|
160 | (2) |
|
|
162 | (3) |
|
Instructions to be in writing |
|
|
162 | (1) |
|
Instructions `other than in writing' |
|
|
163 | (1) |
|
Instructions given to the Contractor |
|
|
163 | (2) |
|
|
165 | (2) |
|
Contractor's obligation to comply and entitlement to query |
|
|
165 | (1) |
|
Non-compliance by Contractor |
|
|
166 | (1) |
|
Variations and provisional sums |
|
|
167 | (42) |
|
Variations: the general position |
|
|
167 | (1) |
|
Variations `to' or `under' the contract? |
|
|
168 | (1) |
|
Variations under JCT 05: definition |
|
|
169 | (2) |
|
|
169 | (1) |
|
|
170 | (1) |
|
Architect's power to order Variations |
|
|
171 | (1) |
|
Contractor's right of objection |
|
|
172 | (1) |
|
Objection to bona fide Variations |
|
|
172 | (1) |
|
Objection to purported Variations |
|
|
172 | (1) |
|
Architect's power to sanction Variations |
|
|
173 | (2) |
|
Variations after practical completion |
|
|
175 | (1) |
|
After due date for practical completion |
|
|
175 | (1) |
|
After actual practical completion |
|
|
175 | (1) |
|
Oral Variation instructions |
|
|
176 | (1) |
|
Instructions with regard to provisional sums |
|
|
177 | (1) |
|
Variations instruction and Valuation |
|
|
178 | (1) |
|
|
178 | (1) |
|
Directions as to choice of method |
|
|
179 | (1) |
|
Variation rules - Agreement by Employer and Contractor |
|
|
179 | (1) |
|
Variation rules - Valuation by the Quantity Surveyor |
|
|
180 | (13) |
|
Variations required or acceded to by the Architect including work covered by Approximate Quantities |
|
|
180 | (1) |
|
|
180 | (1) |
|
Work or other matters which cannot be properly measured |
|
|
181 | (1) |
|
|
182 | (1) |
|
|
182 | (4) |
|
Work covered by Provisional Sums in the Contract Bills |
|
|
186 | (1) |
|
Variations in respect of Work Specified by Performance |
|
|
187 | (1) |
|
Variations in respect of Contractor's Designed Portion |
|
|
188 | (1) |
|
Variations in respect of contractor-designed work: a few typical problems |
|
|
189 | (4) |
|
Variations rules - Quotations |
|
|
193 | (9) |
|
Schedule 2 Quotation: overview |
|
|
193 | (2) |
|
Schedule 2 Quotation: the instruction |
|
|
195 | (1) |
|
Schedule 2 Quotation: the quotation |
|
|
196 | (1) |
|
Schedule 2 Quotation: acceptance |
|
|
197 | (1) |
|
Schedule 2 Quotation: not accepted |
|
|
198 | (1) |
|
Schedule 2 Quotation: further variation |
|
|
199 | (1) |
|
Schedule 2 Quotation: some typical problems |
|
|
200 | (2) |
|
Errors, discrepancy and divergence in and between documents |
|
|
202 | (7) |
|
|
202 | (1) |
|
Status of Contract Bills and CDP documents |
|
|
202 | (1) |
|
Errors and inadequacy in the Contract Bills and CDP documents |
|
|
203 | (2) |
|
Notification and correction of discrepancies, etc. |
|
|
205 | (2) |
|
Divergencies, and compliance with Statutory Requirements |
|
|
207 | (2) |
|
Risks to health and safety: allocation and insurance |
|
|
209 | (25) |
|
General nature of the problem |
|
|
209 | (2) |
|
Allocation of risks under JCT 05 |
|
|
211 | (8) |
|
|
211 | (1) |
|
Risk of personal injury/death |
|
|
212 | (1) |
|
|
213 | (5) |
|
Personal injury and property damage from Excepted Risks |
|
|
218 | (1) |
|
Risk of damage or loss to Works and Site Materials |
|
|
218 | (1) |
|
JCT 05 insurance requirements |
|
|
219 | (12) |
|
Insurance against personal injury or death |
|
|
220 | (1) |
|
Insurance against damage to property |
|
|
221 | (1) |
|
Insurance against Employer's Clause 6.5.1 Risks |
|
|
221 | (1) |
|
Insurance of Works and Site Materials |
|
|
222 | (1) |
|
|
223 | (1) |
|
Insurance under Insurance Option A (by Contractor) |
|
|
223 | (2) |
|
Insurance of Works under Insurance Option B (by Employer) |
|
|
225 | (1) |
|
Insurance of Works, Insurance Option C, Paragraph C.2 (by Employer) |
|
|
225 | (1) |
|
Insurance of existing structures under Insurance Option C Paragraph C.1 (by Employer) |
|
|
226 | (1) |
|
|
226 | (2) |
|
Insurance and sub-contractors |
|
|
228 | (2) |
|
Insurance of off-site materials |
|
|
230 | (1) |
|
Contractor's Designed Portion Professional Indemnity Insurance |
|
|
230 | (1) |
|
|
230 | (1) |
|
|
230 | (1) |
|
|
231 | (1) |
|
Enforcement of insurance requirements |
|
|
231 | (1) |
|
Effect of joint Fire Code |
|
|
231 | (2) |
|
Commercial insurance products |
|
|
233 | (1) |
|
Amendments to the insurance provisions |
|
|
233 | (1) |
|
|
233 | (1) |
|
Novation, assignment and sub-contracting |
|
|
234 | (12) |
|
|
234 | (1) |
|
|
234 | (5) |
|
|
236 | (1) |
|
Assignment after Practical Completion |
|
|
237 | (2) |
|
|
239 | (7) |
|
Sub-contracting under JCT 05 |
|
|
240 | (1) |
|
Sub-contracting under JCT 05 |
|
|
240 | (2) |
|
|
242 | (1) |
|
Effect of termination of the Contractor's employment |
|
|
242 | (1) |
|
|
242 | (1) |
|
|
243 | (1) |
|
Interest on overdue payment |
|
|
243 | (1) |
|
|
244 | (1) |
|
|
244 | (1) |
|
Incorporation of the terms into sub-contracts |
|
|
244 | (2) |
|
Third Party Rights and Collateral Warranties |
|
|
246 | (18) |
|
Introduction - the privity rule |
|
|
246 | (2) |
|
The Contracts (Rights of Third Parties) Act 1999 |
|
|
248 | (2) |
|
|
248 | (1) |
|
|
248 | (1) |
|
Enforcing a term of the contract |
|
|
249 | (1) |
|
Restriction on the parties |
|
|
250 | (1) |
|
JCT 05 - rights of third parties |
|
|
250 | (8) |
|
JCT 05 - Third Party Rights Generally |
|
|
250 | (1) |
|
|
251 | (1) |
|
JCT 05 - Enforcing a term of the contract |
|
|
251 | (2) |
|
JCT 05 - Third Party Rights for Purchasers and Tenants (dealing with `P&T Rights' under Schedule 5: Part 1) |
|
|
253 | (2) |
|
JCT 05 - Third Party Rights for Funder (Schedule 5, Part 2: `Funder Rights') |
|
|
255 | (3) |
|
JCT 05 - Collateral Warranties |
|
|
258 | (3) |
|
JCT 05 - Collateral Warranties generally |
|
|
258 | (1) |
|
JCT 05 - Collateral Warranties from Contractor |
|
|
259 | (1) |
|
JCT 05 - Collateral Warranties from Sub-Contractors |
|
|
260 | (1) |
|
JCT 05 - Third Party Rights, or Collateral Warranties? |
|
|
261 | (3) |
|
Health and Safety obligations under the CDM Regulations |
|
|
264 | (15) |
|
Cooperation and coordination |
|
|
265 | (1) |
|
Competence of CDM dutyholders |
|
|
265 | (1) |
|
|
266 | (1) |
|
|
266 | (2) |
|
|
268 | (2) |
|
|
268 | (1) |
|
Duties during construction |
|
|
269 | (1) |
|
|
270 | (1) |
|
|
270 | (3) |
|
|
273 | (2) |
|
Enforcement of Regulations |
|
|
275 | (3) |
|
Improvement/prohibition notices |
|
|
275 | (1) |
|
Prosecution for criminal offence |
|
|
276 | (1) |
|
Disqualification of Directors |
|
|
277 | (1) |
|
Prosecution for common law gross negligence manslaughter |
|
|
277 | (1) |
|
Prosecution for corporate manslaughter |
|
|
277 | (1) |
|
Civil liability for breaches of the Regulations |
|
|
278 | (1) |
|
|
278 | (1) |
|
|
278 | (1) |
|
Delays, extension of time and liquidated damages |
|
|
279 | (47) |
|
Concept and application of liquidated damages |
|
|
279 | (8) |
|
Concept of liquidated damages |
|
|
280 | (3) |
|
Concept and sectional completion obligation |
|
|
283 | (1) |
|
Application of liquidated damages |
|
|
284 | (2) |
|
Fixing liquidated damages in construction contracts |
|
|
286 | (1) |
|
Effect of delay: general principles |
|
|
287 | (4) |
|
Extension of time and liquidated damages under JCT 05: an outline |
|
|
291 | (1) |
|
|
292 | (9) |
|
|
294 | (1) |
|
Compliance with certain instructions of the Architect |
|
|
294 | (1) |
|
Deferment of possession of site |
|
|
294 | (1) |
|
Work with Approximate Quantity |
|
|
295 | (1) |
|
Suspension for non-payment |
|
|
295 | (1) |
|
Impediment/prevention/default by the Employer |
|
|
296 | (2) |
|
|
298 | (1) |
|
Exceptionally adverse weather conditions |
|
|
298 | (1) |
|
Loss/damage from the Specified Perils |
|
|
299 | (1) |
|
Civil commotion/terrorism |
|
|
300 | (1) |
|
|
300 | (1) |
|
|
301 | (1) |
|
|
302 | (1) |
|
|
301 | (1) |
|
|
302 | (1) |
|
Administrative procedures |
|
|
302 | (6) |
|
Obligations of the Contractor |
|
|
302 | (2) |
|
|
304 | (1) |
|
Importance of the notices of delay |
|
|
305 | (1) |
|
Review of extensions of time |
|
|
305 | (1) |
|
Adjudicating on extension of time |
|
|
306 | (1) |
|
Effect of an adjudicator's extension of time decisions |
|
|
307 | (1) |
|
Deduction of liquidated damages |
|
|
308 | (1) |
|
The Contractor's duty to update the master programme |
|
|
309 | (1) |
|
Deduction of liquidated damages from money decided by an adjudicator |
|
|
309 | (5) |
|
Refund of liquidated damages |
|
|
312 | (1) |
|
Non-Completion Certificate and Withholding Notices |
|
|
313 | (1) |
|
Resisting liability for liquidated damages |
|
|
314 | (3) |
|
Penal liquidated damages provisions |
|
|
314 | (1) |
|
|
315 | (1) |
|
Programme specification defect |
|
|
315 | (1) |
|
No Non-Completion Certificate |
|
|
315 | (1) |
|
No Notice of Liquidated Damages |
|
|
315 | (2) |
|
|
317 | (1) |
|
|
317 | (4) |
|
The first-in-line approach |
|
|
318 | (1) |
|
|
319 | (1) |
|
The dominant cause approach |
|
|
319 | (1) |
|
The apportionment approach |
|
|
320 | (1) |
|
|
320 | (1) |
|
Delays within culpable delay |
|
|
321 | (1) |
|
Extension of time and professional negligence |
|
|
322 | (1) |
|
|
323 | (3) |
|
Preparation and submission of contractor's programme |
|
|
324 | (1) |
|
|
324 | (1) |
|
Extension of time procedures |
|
|
325 | (1) |
|
Claims for damages and contractual claims: an overview |
|
|
326 | (16) |
|
|
326 | (1) |
|
`Contractual' and `common law' claims: similarities |
|
|
327 | (1) |
|
`Contractual' and `common law' claims: differences |
|
|
328 | (1) |
|
|
328 | (1) |
|
|
328 | (1) |
|
|
328 | (1) |
|
`Contractual' and `common law' claims: as alternatives |
|
|
329 | (1) |
|
|
329 | (8) |
|
Cause and effect and global claims |
|
|
329 | (4) |
|
|
333 | (4) |
|
|
337 | (4) |
|
Delay in completion of the Works |
|
|
338 | (1) |
|
Failure to complete the Works |
|
|
338 | (1) |
|
Failure to comply with Architect's Instructions |
|
|
338 | (1) |
|
Correction of defects: limitations and Employer's additional losses |
|
|
339 | (2) |
|
Excessive claims: criminal liability |
|
|
341 | (1) |
|
Contractual money claims under JCT 05 |
|
|
342 | (28) |
|
|
342 | (1) |
|
|
343 | (5) |
|
Application by Contractor (notices) |
|
|
343 | (2) |
|
|
345 | (2) |
|
Relevance of extensions of time |
|
|
347 | (1) |
|
Matters giving rise to entitlement |
|
|
348 | (3) |
|
Deferment of giving possession of the site |
|
|
348 | (1) |
|
List of Relevant Matters affecting regular progress |
|
|
349 | (2) |
|
|
351 | (19) |
|
|
351 | (1) |
|
Site establishment costs, and other-project related overheads |
|
|
352 | (2) |
|
|
354 | (3) |
|
Visiting head office staff |
|
|
357 | (1) |
|
|
357 | (1) |
|
|
358 | (1) |
|
|
359 | (1) |
|
|
359 | (3) |
|
|
362 | (1) |
|
|
363 | (1) |
|
Financing other heads of claim |
|
|
364 | (1) |
|
|
365 | (1) |
|
|
365 | (3) |
|
|
368 | (1) |
|
|
369 | (1) |
|
|
370 | (12) |
|
Fluctuations under Option A |
|
|
370 | (3) |
|
Statutory contributions, levies and taxes in respect of employees |
|
|
371 | (1) |
|
Duties and taxes in respect of materials |
|
|
372 | (1) |
|
Percentage for additional payment |
|
|
372 | (1) |
|
Notices, evidence and calculations |
|
|
372 | (1) |
|
Exclusions from fluctuations under Fluctuations Option A |
|
|
373 | (1) |
|
Fluctuations under Option B |
|
|
373 | (2) |
|
|
373 | (1) |
|
Statutory contributions, levies or taxes |
|
|
374 | (1) |
|
|
374 | (1) |
|
Sub-contractors and suppliers |
|
|
375 | (1) |
|
|
375 | (1) |
|
Exclusions from fluctuations under Option B |
|
|
375 | (1) |
|
Notices, evidence and calculations |
|
|
375 | (1) |
|
Fluctuations under Option C |
|
|
375 | (5) |
|
Calculation of fluctuations |
|
|
378 | (1) |
|
Work Categories/Work groups |
|
|
378 | (1) |
|
Fluctuations after Practical Completion |
|
|
379 | (1) |
|
|
380 | (1) |
|
Delay, suspension and cessation of publication of the indices |
|
|
380 | (1) |
|
Errors, certification and retention |
|
|
380 | (1) |
|
Extension of time, delayed completion and fluctuation |
|
|
381 | (1) |
|
|
382 | (37) |
|
|
382 | (1) |
|
|
383 | (10) |
|
Timing of issue of Interim Certificates |
|
|
383 | (1) |
|
Timetable up to Practical Completion |
|
|
384 | (1) |
|
Timetable after Practical Completion |
|
|
384 | (1) |
|
Payment on Interim Certificates |
|
|
385 | (1) |
|
|
385 | (2) |
|
|
387 | (1) |
|
Contractual grounds for withholding |
|
|
387 | (1) |
|
Other grounds for withholding |
|
|
388 | (1) |
|
Effect of failure to serve the notices |
|
|
389 | (4) |
|
Responsibility for valuation and certification |
|
|
393 | (2) |
|
Valuation for certification |
|
|
395 | (3) |
|
|
395 | (1) |
|
Sums subject to retention |
|
|
395 | (1) |
|
Sums not subject to retention |
|
|
396 | (1) |
|
Deductions to be allowed by the Contractor |
|
|
397 | (1) |
|
Negative Interim Certificates |
|
|
397 | (1) |
|
Unfixed materials and interim Certificates |
|
|
398 | (3) |
|
On-site materials and goods |
|
|
399 | (2) |
|
Off-site materials and goods |
|
|
401 | (1) |
|
Remedies for non-payment by the Employer |
|
|
401 | (4) |
|
|
402 | (1) |
|
Suspension of performance/termination |
|
|
403 | (1) |
|
|
404 | (1) |
|
|
404 | (1) |
|
|
405 | (1) |
|
The treatment of retention funds |
|
|
405 | (3) |
|
|
406 | (1) |
|
Trusts of retention funds |
|
|
406 | (2) |
|
Set-off against retention |
|
|
408 | (1) |
|
The final adjustment of the contract sum |
|
|
408 | (2) |
|
Timetable for final accounts and the final certificate |
|
|
410 | (1) |
|
The effect of the final certificate |
|
|
410 | (1) |
|
Architect's liability for negligent certification |
|
|
410 | (2) |
|
|
412 | (4) |
|
|
413 | (1) |
|
The Advance Payment Bond Form |
|
|
413 | (1) |
|
The Off-site Materials Bond |
|
|
414 | (1) |
|
The Off-site Materials Bond Form |
|
|
414 | (1) |
|
|
415 | (1) |
|
|
415 | (1) |
|
The Local Democracy, Economic Development and Construction Bill, payment and Notices |
|
|
416 | (3) |
|
|
416 | (1) |
|
|
417 | (1) |
|
|
417 | (1) |
|
Disputes over notified sum and Withholding Notices |
|
|
417 | (2) |
|
|
419 | (37) |
|
Termination at common law for repudiation |
|
|
419 | (3) |
|
Conditions and warranties |
|
|
420 | (1) |
|
Wrongful termination at common law |
|
|
421 | (1) |
|
Common law versus the Contract |
|
|
422 | (1) |
|
JCT 05 termination clauses: an overview |
|
|
423 | (1) |
|
Notices required by the termination procedures |
|
|
423 | (1) |
|
|
424 | (2) |
|
Termination by the Employer for specified defaults |
|
|
426 | (6) |
|
Suspension of the Works by the Contractor |
|
|
426 | (1) |
|
Failure to proceed regularly and diligently |
|
|
427 | (1) |
|
Refusal to remove defective work and materials |
|
|
428 | (1) |
|
Assignment and sub-letting |
|
|
428 | (1) |
|
|
428 | (1) |
|
Procedure for termination for the Contractor's default |
|
|
429 | (3) |
|
Termination for the Contractor's insolvency |
|
|
432 | (2) |
|
Instruction to the Contractor to continue |
|
|
433 | (1) |
|
|
433 | (1) |
|
|
434 | (1) |
|
|
434 | (1) |
|
Termination by the Contractor for Employer's defaults |
|
|
434 | (2) |
|
Failure of the Employer to pay |
|
|
434 | (1) |
|
Interference/obstruction by the Employer |
|
|
435 | (1) |
|
|
435 | (1) |
|
|
436 | (1) |
|
Procedure for termination for Employer's defaults |
|
|
436 | (1) |
|
Termination by Contractor for the specified suspension events |
|
|
436 | (2) |
|
Termination by Contractor for the Employer's insolvency |
|
|
438 | (1) |
|
Termination for withdrawal of Terrorism Cover |
|
|
438 | (1) |
|
Termination by either party for loss/damage to the Works |
|
|
439 | (1) |
|
Termination by either party for force majeure and the like |
|
|
440 | (2) |
|
Post-termination rights, obligations and procedures |
|
|
442 | (4) |
|
Termination by Employer for default insolvency or corruption |
|
|
442 | (1) |
|
|
442 | (1) |
|
Assignment of Contractor's contracts with third parties |
|
|
442 | (1) |
|
Removal of temporary buildings, plant and the like |
|
|
442 | (1) |
|
Suspension of further payment to the Contractor |
|
|
443 | (2) |
|
Supply of as-built drawings for CDP |
|
|
445 | (1) |
|
|
445 | (1) |
|
Other termination under the Contract |
|
|
445 | (1) |
|
|
446 | (3) |
|
Where the Works are completed after termination by the Employer for Contractor's default, insolvency or corruption |
|
|
446 | (1) |
|
Expense, loss and/or damage |
|
|
446 | (1) |
|
|
447 | (1) |
|
|
447 | (1) |
|
Where the Works are abandoned after termination by the Employer for Contractor's default, insolvency or corruption |
|
|
448 | (1) |
|
Other termination under the Contract |
|
|
448 | (1) |
|
Contingent liability claims against an Insolvent Contractor |
|
|
449 | (1) |
|
Recoverability of liquidated damages |
|
|
450 | (1) |
|
Meaning of `unreasonably or vexatiously' |
|
|
451 | (1) |
|
Performance bonds and guarantees |
|
|
451 | (1) |
|
|
452 | (4) |
|
|
456 | (53) |
|
The meaning of `dispute' or `difference' |
|
|
457 | (9) |
|
|
457 | (3) |
|
|
460 | (4) |
|
|
464 | (2) |
|
Ambit of the dispute resolution clauses |
|
|
466 | (2) |
|
Matters expressly not subject to review |
|
|
468 | (1) |
|
|
469 | (16) |
|
|
471 | (1) |
|
Appointment of the adjudicator |
|
|
472 | (1) |
|
|
473 | (1) |
|
The response to the Referral Notice |
|
|
474 | (1) |
|
The powers of the adjudicator |
|
|
475 | (1) |
|
Fees and expenses of the adjudicator |
|
|
476 | (1) |
|
Costs incurred by the parties |
|
|
476 | (2) |
|
The Local Democracy, Economic Development and Construction Bill and adjudication costs |
|
|
478 | (1) |
|
|
478 | (1) |
|
|
479 | (1) |
|
The adjudicator's decision |
|
|
480 | (1) |
|
|
480 | (1) |
|
Immunity of the adjudicator |
|
|
481 | (1) |
|
Enforcing the decision of an adjudicator |
|
|
481 | (1) |
|
Summary judgment/interim payment |
|
|
482 | (1) |
|
|
482 | (1) |
|
|
483 | (1) |
|
Proceedings (Civil Procedure Rules) |
|
|
483 | (1) |
|
The adjudicator's powers to correct errors in his decision |
|
|
484 | (1) |
|
Advantages of statutory adjudication |
|
|
484 | (1) |
|
Disadvantages of statutory adjudication |
|
|
485 | (1) |
|
|
485 | (4) |
|
The Civil Procedure Rules |
|
|
486 | (1) |
|
Compliance with the Pre-Action Protocol |
|
|
486 | (1) |
|
|
487 | (1) |
|
|
487 | (1) |
|
|
487 | (1) |
|
Non-compliance with the Protocol |
|
|
488 | (1) |
|
Recovery of cost of compliance with Protocol |
|
|
489 | (1) |
|
|
489 | (10) |
|
JCT 05 arbitration agreement |
|
|
490 | (1) |
|
Enforcement of the arbitration agreement |
|
|
491 | (1) |
|
|
491 | (1) |
|
Choice of three types of procedure |
|
|
492 | (1) |
|
Commencement of arbitration proceedings |
|
|
492 | (1) |
|
Appointment of the Arbitrator |
|
|
493 | (1) |
|
|
493 | (1) |
|
Enforcement of an arbitrator's award |
|
|
494 | (1) |
|
Court intervention into arbitration |
|
|
495 | (1) |
|
Appointment of arbitrators |
|
|
495 | (1) |
|
Extension of time for commencement of arbitration |
|
|
496 | (1) |
|
|
496 | (1) |
|
Resignation of an arbitrator |
|
|
496 | (1) |
|
|
496 | (1) |
|
Determination of recoverable costs |
|
|
496 | (1) |
|
Determination of preliminary points of law |
|
|
497 | (1) |
|
Appeals against an arbitration award |
|
|
497 | (2) |
|
Arbitration or litigation |
|
|
499 | (7) |
|
|
499 | (1) |
|
|
500 | (1) |
|
|
500 | (1) |
|
|
500 | (1) |
|
|
501 | (1) |
|
|
501 | (1) |
|
|
501 | (1) |
|
|
501 | (1) |
|
Future business relations |
|
|
502 | (1) |
|
|
502 | (1) |
|
|
502 | (1) |
|
|
503 | (1) |
|
|
504 | (1) |
|
|
504 | (2) |
|
|
506 | (1) |
|
|
506 | (1) |
|
|
506 | (3) |
Table of Cases |
|
509 | (21) |
Table of Clause References |
|
530 | (9) |
Table of Statutes and Statutory Instruments |
|
539 | (6) |
Subject Index |
|
545 | |